User:Two hundred percent/Dirtbox/Muar State Railway
Muar State Railway | |
---|---|
Overview | |
Status | Ceased operation |
Locale | Johore, Malaya. |
Termini |
|
Stations | 5 permanent stations and 8 temporary stations. |
Service | |
Type | Passenger and freight light rail |
Services | 1 |
Operator(s) | Muar district government |
Rolling stock | >3 steam locomotive; unknown number of railroad cars. |
History | |
Opened | 1890 |
Closed | 1929 |
The Muar State Railway (MSR) was a railroad operating in the district of Muar in Johore state, Malaya. Significantly, the MSR was the second railway line to operate in the state of Johore after the short-lived Johore Wooden Railway (JWR), and began operation in 1890, five years after the openning of Perak Railway's Taiping-Port Weld line. In comparison to the JWR, the MSR was more successful commercially, operating for 39 years before facing closure under stiff competition coupled with rising operation costs.
Rationale
[edit]During the late 19th century, the district of Muar enjoyed significant economic growth as a result of a boom in the agricultural industry around the newly formed town of Bandar Maharani (also known as Muar town). As a result, Muar was economically important in the state of Johore.
The need for a railway arose when Parit Jawa, an area under Muar south of Bandar Maharani, required safe passage for the transportation of crops such as gambiers, coconuts and Pinangs. As Parit Jawa was inaccessible to Bandar Maharani via land, transport of goods would have to be conducted by river and sea, which were exposed to pirate attacks.
On November 13, 1887, a discussion was held between Resident Tungku Sulaiman and the head for the Land Office and Agriculture Affairs of Muar district, Dato' Bentara Luar, which concluded with an agreement to construct a railway line between Bandar Maharani and Parit Jawa for dual uses: To transport passengers between the two localities, and to improve transportation of goods.
Construction and extensions
[edit]Early construction work on the Muar State Railway line were conducted mostly by Malay and Javanese workers, the latter having migrated in masses to the Malay peninsular, with low pay and no permanent jobs. Construction of the MSR commenced early 1889 with materials entirely supplied from Europe, the line from Jalan Sulaiman (Sulaiman Road) in Bandar Maharani to Parit Jawa completed in 1890. In 1894, the line was extended another 3 miles (4.8 km) to Sungai Pulai.
By 1915, the profitability of the MSR motivated the Sultan of Johore to suggest an extension of railway services up to the Batu Pahat river, but never materialised due to financial factors and geographical conditions.
Stations
[edit]The Muar State Railway included a total of 13 stations, of which 5 were permanent and 8 were temporary.
Permanent stations:
Temporary stations:
- Parit Perupok
- Parit Keroma
- Parit Raja
- Parit Unas
- Parit Samsu
- Parit Jamil
- Parit Bulat
- Parit Seri Menanti
Rolling stock
[edit]In its first years of operation, the Muar State Railway was estimated to own 3 steam locomotives: On January 28, 1889, as construction of the railroad was underway, the first two locomotives were ordered from Black, Hawthorn & Co bearing works numbers 962 and 963; the third Black, Hawthorn & Co locomotive bearing works number 1017 was ordered later on July 5, 1890. During World War I, new locomotives from the United States were procured.
The trainsets of the MSR were originally planned for mixed use, consisting of an engine, 5 passenger coaches with outward facing seats (divided into first class, second class and third class), three goods vans and two further vans. This gave each trainset the ability to transport both freights and passengers, which partially contributed to the MSR's initial success.
The fare for passengers was five cents per mile. As agreed in 1887, free transportation was to be given to school children who went to Bandar Maharani's English school.
Operation and decline
[edit]The Muar State Railway was financially successful due largely to improved demand. In 1915, income for the MSR reached ?RM? 86,701.92 compared to an expenditure of ?RM? 63,216.77.
Numerous factors were attributed to the increase in demand. As the MSR was operational during its early years, the growth of economic activities in Muar, coupled with a cessation of sea transport, fueled demands for MSR's train services. In addition, the MSR's decision to utillise train sets accommodating both freights and passengers helped improve frequency of services and maximised each locomotive's potential. By the time the MSR was extended to Sungai Pulai in 1894, the MSR train ran five times a day.
The MSR suffered several technical difficulties throughout its service. In its later years, it became known soft ground under the line left parts of the MSR line vulnerable to collapse, resulting in the need to pile the ground each time a train passed through the areas and contributing to the line's increasing expenditure.
By the 1920s, profitability of the MSR declined as the MSR's rolling stock were aging while maintenance costs on the railway and stations were increasing. The MSR also faced competition from newly introduced road transport: Jalan Abdul Rahman, a road between Bandar Maharani and Parit Jawa, openned in 1925 and rendered the MSR redundant. Lagging behind road-based vehicles, the MSR finally ceased operation in 1929.
Legacy
[edit]The Muar State Railway was the last state-run railway to operate in Johore. By 1915, other state run railway operators such as Perak Railway and Selangor Railway have consolidated to form the Federated Malay States Railways (FMSR), which went on to extend its existing lines in Perak and Selangor to the north, south and east in Malaya. Under an agreement with the FMSR, the Johore state government participated in the development of the FMSR line by forming Johore Railway (JR), which undertook the construction of the Johore segment of the mainline from its boundary with Negeri Sembilan to Johor Bahru, before allowing itself to be absorbed into the FMSR in 1912. While Johore received FMSR train services upon completion of the line in 1909, the FMSR line bypassed all urban centres in Muar, leaving the MSR line unconnected to the wider FMSR network. Following the absorption of JR into the FMSR, the MSR remained in service for an additional 17 years before its closure.
Little remains of the MSR line and stations. Following its closure, most of the railway system were demolished or paved over. While the fate of the MSR's rolling stock is largely unknown; only one MSR locomotive of unknown specification serves as a permanent display in a park in Muar town.
References
[edit]- Hassni Bin Hussin (hassny@tm.net.my) and malsoh@hotmail.com (2006-12-01). "The Muar State Railway". Retrieved 2008-07-08.
{{cite web}}
: External link in
(help)CS1 maint: numeric names: authors list (link) (searail.mymalaya.com mirror)|author=
- HISTORY OF MUAR STATE RAILWAY (1889-1925)
- KERETAPI MUAR
- [1]
- [2]
Category:Rail transport in Johor
Category:Defunct railroads
Category:Railway companies established in 1890
Category:Railway companies disestablished in 1929