Jump to content

User:Robertiki/sandbox

From Wikipedia, the free encyclopedia

Testing local interlanguage should go here.

{{Diff|Mazyr|1169063604|1169063489|mazyr_before}}

Test Section

[edit]

[1] [2]

[3]

Link to Arab Ain Beni Mathar Integrated Thermo Solar Combined Cycle Power Plant page:

ABM

Title: محطة توليد الكهرباء بالطاقة الشمسية والغاز في عين بني مطهر (The solar and gas power plant in Ain Bani Mathar).

Next Section

[edit]

Minimum cite: {{cite web |url= |title= |date= | publisher= |url-status= |archive-url= |archive-date= |access-date= }}

Content assessment link and Featured article candidates and Good article nominations

TBD Maricopa Solar [1] and check

Italian: solare termodinamico

(†) dagger

Ausra [4] Link to archive

#ffdead
#999900
#BBBB22
lightsteelblue
#CCF
#FFFFCC
Orange

deleted material inserted material

39°32′53″N 118°33′20″W / 39.54806°N 118.55556°W / 39.54806; -118.55556 - 46°26′28″N 8°50′20″E / 46.44111°N 8.83889°E / 46.44111; 8.83889

Robertiki/sandbox
StatusBeing decommissioned
Solar farm
Site resource1800 kWh/m2/year
Power generation
Annual net output9900 GW·h

39 hectares (96 acres)

Currency

[edit]

1,700 crore (US$203.69 million) updated as in Template:INRConvert/CurrentRate 17,000 crore (US$2.04 billion)

Template converter {{To USD|1700|India}} million results in 22.94 million

{{currency|204|ZAR}} million (${{To USD|204|ZAF|year=2016}} million) yields:

R 204 million ($13.87 million)
R 5 billion ($339.93 million)

Convert

[edit]

900 feet (270 m)

220 miles (350 km)

1.78 kilometres (1.11 miles)

5 metres (16 ft 5 in)

5.5 metres (18 ft) 6 feet (1.8 m)

18 feet 1 inch (5.51 m)

5,141 acres (2,080 ha)

1,245 square feet (115.7 m2) 115.7205 square metres (1,245.605 sq ft)

400 °C (752 °F)

6.27 square kilometres (2.42 sq mi) 2 square miles (5.2 km2)

Testing coordinates:

41°12′N 141°23′E / 41.2°N 141.39°E / 41.2; 141.39 (Tohoku Higashidōri Nuclear Power Plant)

History

[edit]
Schematic of a hybrid thermo solar and biomass power plant

6,300 square feet (585.3 m2)*

Solar

[edit]

The MARC-2 turbine operates in the 4-10 MW power range and accepts up to 90 bars (1,300 psi) (1,305 psi), 520 °C (968 °F) (968 °F) max steam inlet. The MARC-6 turbine operates in the 15-40 MW power range and accepts up to 121 bars (1,750 psi) (1,740 psi), 530 °C (986 °F) (986 °F) max steam inlet.

Production

[edit]

Crescent Dunes Solar Energy production is as follows (values in GW·h).[5]

Year Solar Fossil Total
2015 1,831 0 1,831

Martin [6]

Ivanpah plant fuel consumption history (2014-2015)
Year Unit 1 Unit 2 Unit 3 ISEGS Totals
Solar
(MMBtu)
Natural
gas
(MMBtu)
Total
Unit 1
(MMBtu)
Solar
(MMBtu)
Natural
gas
(MMBtu)
Total
Unit 2
(MMBtu)
Solar
(MMBtu)
Natural
gas
(MMBtu)
Total
Unit 3
(MMBtu)
Solar
(MMBtu)
Natural
gas
(MMBtu)
Plant
Total
(MMBtu)
2014 1,445,195 270,463 1,715,658 1,229,291 274,873 1,504,164 1,311,011 262,298 1,573,309 3,985,497 807,634 4,793,131

Other

[edit]

NextEra may refer to:


/Arktika test

Bookmarks

[edit]

User:Teratornis/Outplacement

To be updated


References

[edit]
  1. ^ . doi:10.1109/IECON.2009.5415153. {{cite journal}}: Cite journal requires |journal= (help); Missing or empty |title= (help)
  2. ^ . doi:10.1093/bioinformatics/btl302. {{cite journal}}: Cite journal requires |journal= (help); Missing or empty |title= (help)
  3. ^ . doi:10.1109/IECON.2009.5415153. {{cite journal}}: Cite journal requires |journal= (help); Missing or empty |title= (help)
  4. ^ "None". Archived from the original on 14 July 2016. Retrieved 14 July 2016. {{cite web}}: |archive-date= / |archive-url= timestamp mismatch; 5 July 2008 suggested (help); Unknown parameter |dead-url= ignored (|url-status= suggested) (help)
  5. ^ Energy Information Administration. "Crescent Dunes Solar Energy, Annual". Electricity Data Browser. Retrieved January 17, 2016.
  6. ^ Energy Information Administration. "Martin, Annual". Electricity Data Browser. Retrieved March 7, 2016.