User:M nurhaikal/sandbox
Appearance
North-South line | |
---|---|
Overview | |
Status | Under construction (Phase 1) Planned (Phase 2) |
Owner | Government of Jakarta |
Termini |
|
Stations | 13 (Under construction) 7 (Planned) |
Service | |
Type | Rapid transit |
System | Jakarta MRT |
Services | 1 |
Operator(s) | PT MRT Jakarta |
Depot(s) | Lebak Bulus |
History | |
Opened | 31 March 2019 |
Technical | |
Line length | 15.7 km (9.8 mi)(Phase 1) |
Character | Elevated (Lebak Bulus - ASEAN) Underground (Senayan - Bundaran HI) |
Track gauge | 1,067 mm (3 ft 6 in) |
Electrification | 1500V DC Overhead catenary |
Operating speed | limit of 100 km/h (62 mph) |
The North-South line is a Mass Rapid Transit line in Jakarta. It runs from Lebak Bulus to Bundaran HI. The line is currently 15.7 kilometres long with 13 stations,and a full journey from one end to the other takes around 30 minutes. The line is coloured blue on the rail map.
The first phase of the line will commence operations in March 2019. Phase 2 will extend the line northwards. It will consists of 7 stations over 7.8 kilometres. It is expected to begin operations by 2024.