User:Jonathan serapio 3094
Cite error: There are <ref>
tags on this page without content in them (see the help page).Inside & Outside In The Buliding 2:
1. Radio & Television Studios 2. Control Room 1 & 2 3. Radio & Television Newsroom 4. Main Office 5. Meeting Room 6. Bathroom & CR 7. Voiceover Room
Inside & Outside In The Buliding 3:
1. TV Station Transmitter Tower 2. Radio Station Transmitter Tower 3. TV Station Transmitter Switch - Digital TV 4. Radio Station Transmitter Switch
Total: 11 Rooms Capacity
With Studio-Office & Transmitter: Radio & Television Broadcast Center & Transmitter Buliding @ Serapio-Francia Building 2 - Purok 3 Street, Barangay Talacsan Road, Talacsan, San Rafael, Bulacan:
Broke Ground: March 10, 2022 Opening: September 20, 2023 Construction Workers For Men: 20 Peoples