Jump to content

User:Imzadi1979/Sandbox2

From Wikipedia, the free encyclopedia

Overall topic

[edit]
All GAs/FAs and FLs

80% completed (estimate)

   

FAs and FLs
50% needed for FT

80% completed (estimate)

   

Interstates

[edit]
All GAs/FAs and FLs

100% completed (estimate)

   

FAs and FLs
50% needed for FT

53.8% completed (estimate)

   

Interstate 96

[edit]

US Highways

[edit]
All GAs/FAs and FLs

100% completed (estimate)

   

FAs and FLs
50% needed for FT

52% completed (estimate)

   

State trunklines

[edit]
All GAs/FAs and FLs

99.4% completed (estimate)

   

FAs and FLs
50% needed for FT

3.6% completed (estimate)

   

M-28

[edit]