Jump to content

User:BostonUrbEx/Transport Improvements

From Wikipedia, the free encyclopedia

Commuter Rail

[edit]

Platform Raising

[edit]
Rank Station Name Ridership† Note
3 Beverly Depot 2058
4 Lowell 1770
5 Mansfield 1707
6 Attleboro 1665
8 Worcester 1475
9 South Attleboro 1462
10 Framingham 1299
11 Norwood Central 1185
12 West Natick 1121
13 Canton Center 1113
14 Needham Heights 1104
15 Natick 1077
16 North Billerica 1076
17 Stoughton 1067
18 Southborough 1051
19 Sharon 1048

† Based on 2014 Blue Book statistics (Typical Weekday, Inbound Only)

Station Placement

[edit]

Relocation

[edit]
  • Chelsea — The current Chelsea station, extending east from the Arlington & Sixth crossing, is anticipated to be relocated to Mystic Mall, between Everett Ave and W Third St with egress to both, as a part of the Silver Line Gateway project. The station should remain in the vicinity of its current location, and should thus be relocated in the future to the stretch of track between the Arlington & Sixth crossing and the Broadway overhead bridge. Egress at this location would be by handicap ramp to the Arlington & Sixth crossing, elevator and stairs to Washington St overhead bridge, and elevator, escalator, and stairs to the Broadway overhead bridge. There will be an MBTA Silver Line connection available at this location.
  • Salem

Consolidation

[edit]

Elimination

[edit]