Jump to content

User:A Chinese ID

From Wikipedia, the free encyclopedia
Good Articles (0)
Baoji–Chengdu railway Nominee
The first electrified rail line in mainland China is a mixed single- and double-track, 676-kilometer one in China between Baoji in Shaanxi province and Chengdu in Sichuan province which finished construction on 12 July 1956 and opened on 1 January 1958. It's also one of main lines that connects southwestern with northwestern China and a part in Lanzhou-Kunming Corridor of the Eight Verticals.
Featured Articles (0)

Yes, there's no featured articles composed by the user at this moment. Please come back later.