Jump to content

Udine–Trieste railway

From Wikipedia, the free encyclopedia
Udine–Trieste railway
The Gorizia railway bridge in 2006, part of the Udine-Trieste railway
Overview
Line number64
Termini
Service
Typeheavy rail
Operator(s)Rete Ferroviaria Italiana
History
Opened1860
Technical
Line length82.683 km (51.377 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification3 kV DC, overhead line
Operating speed180 km/h (110 mph)
Route map

km
0.000
Udine
108 m
to Tarvisio (RFI) / to Cividale (FUC)
1.672
Udine Parco
2.975
5.182
Pradamano
(1950[1]–2002)
8.675
Buttrio
13.146
Manzano
66 m
15.335
San Giovanni al Natisone
63 m
Iudrio
Italy
Austria-Hungary
border
(1866–1919)
20.785
Cormons
54 m
to Redipuglia (not finished)
25.652
Capriva
28.000
Mossa
30.6
Lucinico-Calvario
† 1975
32.862
Gorizia Centrale
72 m
Savogna d'Isonzo-Val Vipacco
to Bertiolo (not finished)
38.8
Rubbia-San Michele
(closed 1990)
53 m
43.6
Gradisca-San Martino
(closed 2002)
46.000
Sagrado
from Cormons (not finished)
48.190
Redipuglia
19 m
51.235
Ronchi dei Legionari Nord
53.677
116.266
San Polo junction
(closed 2016)
117.746
Monfalcone
23 m
new link to Monfalcone Porto
122.039
San Giovanni tunnel
125.2
Duino-Timavo
85 m
127.730
Sistiana-Visogliano
130.463
Bivio d'Aurisina
135 m
131.315
13.687
Galleria junction
11.021
Santa Croce di Trieste
(closed 2002)
8.265
Grignano passing loop
(station closed 2010)
81 m
7.033
Miramare
2.269
Barcola exchange group
1.424
Gretta exchange group
Barcola marshaling yard
Trieste Centrale goods yard
0.000
Trieste Centrale
5 m
Linea delle Rive
(dock railway, closed 1981)
Source: Italian railway atlas[2]

The Udine–Trieste railway is an Italian state railway line that connects Udine and Trieste running through the central and eastern part of Friuli-Venezia Giulia.

The whole line is double track and electrified at 3000 Volts DC. The only station that serves as an interchange with other lines is Monfalcone, which is near the junction with the Venice–Trieste railway: the Monfalcone–Trieste section is shared with this line.

The railway infrastructure is managed by the Rete Ferroviaria Italiana, which classifies it as one of its primary lines,[3] while both regional and long-distance passenger traffic is managed by Trenitalia. The railway is used by the freight trains of various railway companies.

History

[edit]
Section Opened[4]
Trieste–Galleria junction 28 July 1857[note 1]
Galleria junction–Cormons 1 October 1860
Cormons–Udine 3 October 1860

The line dates back to the times of the Austrian Empire, because its government wanted to connect its capital of Vienna with the Kingdom of Lombardy–Venetia.

The Vienna–Trieste (Südbahn) and Venice–Trieste (Ferdinandsbahn) lines were completed in 1857.

The Udine–Trieste railway, opened in 1860, ran from Aurisina (later called Nabresina) near Trieste to Udine. The western section of the Venice–Udine railway between Udine and Casarsa, including the bridge over the Tagliamento, was opened at the same time.[4]

In 1866, after Lombardy had been annexed to the Kingdom of Sardinia, Veneto was also annexed to the Kingdom of Italy following the Austro-Prussian War. The line thus became an international railway and Cormons station became a border station. The whole line became Italian In 1918.

Duplication between Mossa and Rubbia was completed on 13 March 1988[5] and the next section between Rubbia and Sagrado on 8 April 1990.[6]

References

[edit]

Notes

[edit]

Footnotes

[edit]
  1. ^ Ordine di Servizio (in Italian) (129). FS. 1950.{{cite journal}}: CS1 maint: untitled periodical (link)
  2. ^ Railway Atlas 2017, pp. 11, 27, 139.
  3. ^ "Rete in esercizio" (PDF) (in Italian). RFI. Archived from the original (PDF) on 21 February 2020. Retrieved 1 September 2020.
  4. ^ a b Prospetto cronologico 1926.
  5. ^ "Notizia flash". I Treni Oggi (in Italian) (82): 6. May 1988.
  6. ^ "Impianti FS". I Treni Oggi (in Italian). XI (106). Salò: Editrice Trasporti su Rotaie: 8. July–August 1990. ISSN 0392-4602.

Sources

[edit]