Tongchuan Road station
Appearance
General information | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location | Daduhe Road and Tongchuan Road, Putuo District, Shanghai China | |||||||||||||||
Coordinates | 31°15′09″N 121°23′34″E / 31.252570°N 121.392751°E | |||||||||||||||
Line(s) | Line 15 | |||||||||||||||
Platforms | 4 (2 island platforms) | |||||||||||||||
Tracks | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | 23 January 2021 30 December 2021 (Line 14) | (Line 15)|||||||||||||||
Services | ||||||||||||||||
|
Tongchuan Road (Chinese: 铜川路) is an interchange station of the Line 15 and Line 14 of the Shanghai Metro. Located at the intersection of Daduhe Road and Tongchuan Road in the city's Putuo District, the station was scheduled to open in 2020, when both lines were expected to begin operations.[1] However, the station eventually opened on 23 January 2021 following a one-month postponement of the line 15. The station later became an interchange after Line 14 opened on 30 December 2021.[2]
Station Layout
[edit]G | Entrances and Exits | Exits 1-5 |
B1 | Concourse | Faregates, Station Agent |
B2 | Westbound | ← Line 14 towards Fengbang (Zhenguang Road) |
Island platform, doors open on the left | ||
Eastbound | Line 14 towards Guiqiao Road (Zhenru) → | |
B3 | Northbound | ← Line 15 towards Gucun Park (Shanghai West Railway Station) |
Island platform, doors open on the left | ||
Southbound | Line 15 towards Zizhu Hi-tech Park (North Meiling Road) → |
References
[edit]- ^ Shanghai Putuo (2018-10-09). "上海三条在建地铁14/15/18号线将全部无人驾驶". Bendibao.com (in Chinese). Retrieved 2018-12-31.
- ^ 1月23日起上海地铁15号线开通初期运营 [Shanghai Metro Line 15 to open on 23 January]. www.shmetro.com (in Chinese). 21 January 2021. Retrieved 21 January 2021.