Terminal 3 of Jiangbei Airport station

From Wikipedia, the free encyclopedia
Terminal 3 of Jiangbei Airport

江北机场T3航站楼
General information
LocationYubei District, Chongqing
China
Operated byChongqing Rail Transit Corp., Ltd
Line(s)     Line 10
Platforms4 (2 island platforms)
Connections GTC (Ground Traffic Center of Terminal 3)
Construction
Structure typeUnderground
Accessible6 accessible elevators
Other information
Station code10/19
History
Opened28 December 2017; 6 years ago (2017-12-28)
Services
Preceding station Chongqing Rail Transit Following station
Changhe
towards Lanhualu
Line 10 Terminal 2 of Jiangbei Airport
Chongqing North Station North Square
towards Lanhualu
Line 10
Rapid

Terminal 3 of Jiangbei Airport is a metro station of Line 10 of Chongqing Rail Transit in Yubei District of Chongqing Municipality, China.[1][2]

It serves the airport terminal in which the station's name derived from (Terminal 3A of Chongqing Jiangbei International Airport) and its surrounding area, including office buildings for Chongqing Airport Group and other facilities used by both airlines and the airport.

The station opened 4 months after the inauguration of Terminal 3A of the airport,[3] before this public transportation to the terminal was served solely by airport buses and long-distance coaches. Free terminal shuttle buses were also arranged by the airport for passengers transferring between Terminals 2A & 2B and Terminal 3A[4] partially to compensate the lack of the 2 Line 10 stations linking the terminals. The shuttle buses remain in service to this day as an alternative to the metro line.

A LCD screen on a Line 10 train displaying its approach to the station

Station structure

[edit]

Line 10 platforms

[edit]
Platform Layout

A total of 2 island platforms is used for Line 10 trains travelling in both directions.

Normal Line 10 services (stopping at all stations along the line) run through the 2 outer tracks whereas the 2 inner tracks are reserved for future Line 10 services with alternate route plans.

To      Line 10 Houbao 10/19
Island Platform

Doors open on the left

Track reserved 10/19 Track reserved For alternate      Line 10 routing
For alternate      Line 10 routing Track reserved 10/19 Track reserved
Island Platform

Doors open on the left

10/19 To      Line 10 Wangjiazhuang

Exits

[edit]

There are a total of 6 entrances/exits for the station.

Exit To
1 Taxis
2 Domestic Departures, International Departures
3 Domestic Departures, International Departures
4 Domestic Arrivals, International Arrivals
5 Car park
6 Airport buses

Surroundings

[edit]
GTC
  • Chongqing Jiangbei International Airport

Situated inside the Ground Traffic Center (GTC) of Terminal 3, the station is transferable with other modes of ground transportation at the terminal, including terminal shuttle buses, airport buses, long-distance coaches, taxis, car pooling services and private cars. Intercity railway services operated by CRH will also be available when its construction is complete.

Nearby Stations

See also