Jump to content

Template talk:East San Fernando Valley Light Rail Transit Project

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Antelope Valley Line crossing

[edit]

The diagram as we have it now makes it look as if the Metrolink line will cross the new light rail line south of the Van Nuys/San Fernando station. On the diagram map on Metro's page, it looks like the crossing actually happens north of the station; in actuality, the phase 2 section will run in parallel to the Metrolink line for its whole length, and I'm actually not even sure the two lines are going to cross. Could we perhaps show the two lines running in parallel north of the Phase 2 divider? --Jfruh (talk) 14:08, 18 July 2024 (UTC)[reply]