Talk:Waikato Expressway
This article is rated C-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | ||||||||||||||||||||||||
|
Hamilton Section
[edit]Costs $636m https://www.nzta.govt.nz/projects/waikato-expressway/hamilton/ Older version of exact same link shows old estimate of $974m https://web.archive.org/web/20160601000000*/https://www.nzta.govt.nz/projects/waikato-expressway/hamilton/ — Preceding unsigned comment added by 131.203.247.130 (talk) 04:53, 22 May 2017 (UTC)
- There is no press release that I can find that suggests the project was lowered from $974m to $636m anywhere, either from NZTA or from independent sources. $636m is not a reliable figure. Ajf773 (talk) 04:56, 22 May 2017 (UTC)
- Oh ok, so the official NZTA source for the estimate which has changed from the number you keep stating is just an error? Perhaps you should inform them that their website now says $636m instead of the "correct" $973m. http://www.nzta.govt.nz/assets/projects/waikato-expressway/docs/key-facts-hamilton.pdf https://www.nzta.govt.nz/projects/waikato-expressway/hamilton/ WHY IS NZTA NOT A RELIABLE SOURCE?
- The first source you provided is an estimate, the second is a figure that does not correlate with the source I provided on the article page, a press release of the sod turning of the expressway section and its contracted figure. As far as I'm concerned nothing has changed. I may have to write to NZTA to get them to verify their project website. Ajf773 (talk) 05:08, 22 May 2017 (UTC)
Leading section updation
[edit]Leading section seems a little off now that Hamilton is bypassed. I attempted to make the leading section more correct to its overall information, but it may need some more fixing. Qwertyxp2000 (talk | contribs) 05:55, 16 July 2022 (UTC)
How long is the Expressway?
[edit]A description dating back to 2010, when parts were still being investigated, said, "it will be 102km, some 6km shorter than the current State Highway 1". The article says, "101.4 km (63.0 mi) long", but its source only repeats the 102 figure. Google maps says Bombay to the end of the Cambridge bypass is 113km and the old route is 117km. 113 is the total of the distances in the first table, but not in the second table. What are the sources for the tables and are there any better? Johnragla (talk) 15:37, 27 July 2022 (UTC)
- The expressway starts at Mill Road (exit 471 on SH 1) and ends at Cambridge Road. I got this: [1]. I have no reason to dispute 102km as the full length. Ajf773 (talk) 21:23, 27 July 2022 (UTC)
- Sorry, I'd not noticed I'd picked the northbound carriageway at Mill Rd, rather than southbound, but it's still 4km shorter than the old route. Johnragla (talk) 06:16, 28 July 2022 (UTC)
Exit list
[edit]I updated the exit list to use the modern template. There are three at-grade intersection on the Mercer section near Meremere, these state there are proposals to either close or upgrade these. I have not found any sources confirming these plans. I am tempted to remove from the notes unless sources can be found. Ajf773 (talk) 21:25, 27 July 2022 (UTC)
- I've searched for Spring Hill, Oram and Island Block roads and can't find any current plan to change their SH1 junctions. Johnragla (talk) 05:36, 29 July 2022 (UTC)
- Me neither, I'll keep this open for a little while longer and see if anyone else knows a bit more. Ajf773 (talk) 10:19, 29 July 2022 (UTC)
- C-Class New Zealand articles
- Low-importance New Zealand articles
- WikiProject New Zealand articles
- C-Class Highways articles
- Low-importance Highways articles
- C-Class Oceania road transport articles
- Low-importance Oceania road transport articles
- Oceania road transport articles
- C-Class Road transport articles
- Low-importance Road transport articles
- WikiProject Highways articles