GA Review

[edit]
GA toolbox
Reviewing

Article (edit | visual edit | history) · Article talk (edit | history) · Watch

Reviewer: Albacore (talk · contribs) 19:37, 3 June 2012 (UTC)[reply]

  • Not convinced that tunnel has to be linked in the lead, as it's a common term
    • I wouldn't link this in regular prose, but I feel that as this is an article about a tunnel, there is a significantly above-average chance that a reader might want go to the tunnel article. Arsenikk (talk) 11:51, 4 June 2012 (UTC)[reply]
  • Therefore, one of the main focuses in the Skaugum Tunnel project was to avoid similar leaks, and the criteria were set to 4 liters (0.88 imp gal; 1.1 US gal) per minute per 100 meters (330 ft). This was achieved by using sufficient time for the pre-injection. Don't understand what is meant by "the criteria were set to 4 liters (0.88 imp gal; 1.1 US gal) per minute per 100 meters (330 ft)", and I don't understand the second sentence.
  • with water running down the walls and collecting in the cable conduit perhaps link "conduit"

I'm putting the article on hold. Best, Albacore (talk) 19:37, 3 June 2012 (UTC)[reply]

Thanks for taking the time to review the article, you comments are most appreciated. Arsenikk (talk) 11:51, 4 June 2012 (UTC)[reply]
Re-read, and everything looks good. Pass. Albacore (talk) 19:51, 4 June 2012 (UTC)[reply]