Jump to content

Talk:Revesby railway station

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

New timetable from 11 October 2009

[edit]

That is when the new timetable is supposed to start, and all but one East Hills trains are terminated at Revesby. Tabletop (talk) 07:16, 2 August 2009 (UTC)[reply]

Diagrams not correct.

[edit]


Comments

[edit]

The diagrams are not correct in that the higher speed turnout straight route is shown curved aqnd visa versa.

The line from East Hills at the left should smoothly connect with platform 1 at the top, while platform 2 has a buffer stop.

The line to East Hills at the left should also connect soomthly with platform 4, while platform 3 connection with a reasonably high speed turnout.

All of these connections are made on a sweeping righthand curve.

Tabletop (talk) 06:54, 31 December 2010 (UTC)[reply]

File:Revesby Railway Station1.jpg Nominated for Deletion

[edit]
An image used in this article, File:Revesby Railway Station1.jpg, has been nominated for deletion at Wikimedia Commons in the following category: Media without a source as of 8 December 2011
What should I do?

Don't panic; a discussion will now take place over on Commons about whether to remove the file. This gives you an opportunity to contest the deletion, although please review Commons guidelines before doing so.

  • If the image is non-free then you may need to upload it to Wikipedia (Commons does not allow fair use)
  • If the image isn't freely licensed and there is no fair use rationale then it cannot be uploaded or used.

This notification is provided by a Bot --CommonsNotificationBot (talk) 16:25, 8 December 2011 (UTC)[reply]