Jump to content

Talk:Process area (CMMI)

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Content Needed

[edit]

I created this article to give more detail about the CMMI. The process areas are truly the "guts" of the CMMI, but detail about them doesn't belong in the more general CMMI article. Each article has enough content to stand on its own, but they would become unwieldy if merged together.

I'm going to flesh out the bones of this article as time permits. Anybody willing to help is welcome to do so. /* Pradeep Arya 04:49, 5 January 2006 (UTC) */[reply]

I think if each process area contained each of the specific goals and specific practices of that area, along with notes (which other process areas are relevant, what specific goals/practices might be covered under generic goals from other process areas, etc.), then this article will be nearly complete.

If additional details about each process area are required, then those process areas should probably be broken out into their own articles, and referenced from this article. /* Pradeep Arya 09:42, 6 January 2006 (UTC) */[reply]


I would be happy to add a section to the Quantitative Project Management section to illustrate with an example how to achieve QPM. — Preceding unsigned comment added by Robert PASTOR (talkcontribs) 13:30, 16 February 2013 (UTC)[reply]

It seems that the sections on SD - Service Delivery, WMC - Work Monitoring and Control & WP - Work Planning are missing. It doesn't list the SGs or SPs. — Preceding unsigned comment added by 14.203.111.34 (talk) 00:49, 12 February 2018 (UTC)[reply]

Why are maturity levels included? Is that the maximum level the particular practice can achieve? — Preceding unsigned comment added by 208.98.206.2 (talk) 23:28, 26 February 2018 (UTC)[reply]