Jump to content

Talk:Portage Glacier Highway/GA1

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

GA Review

[edit]
GA toolbox
Reviewing

Article (edit | visual edit | history) · Article talk (edit | history) · Watch

Reviewer: Dough4872 (talk · contribs) 00:59, 9 May 2012 (UTC)[reply]

GA review (see here for criteria)

  1. It is reasonably well written.
    a (prose): b (MoS):
    • I do not like the structure of the route description in referring to parts of the road such as the first part, second part, etc. This should be reworded.
     Done I believe this is fixed.
    There are a lot of sentences with "this stretch". Can some other words be used for some of these? Dough4872 20:31, 12 May 2012 (UTC)[reply]
     Done I think
    • The headers in the route description should be fixed. Either add a header for the section west of the Anton Anderson Memorial Tunnel or remove the headers completely. I would recommend the latter.
     Done
    Is it possible for a header to be added to the first section of the Route description? Dough4872 20:31, 12 May 2012 (UTC)[reply]
     Done
    • There should not be bolding in the route description.
     Done
    • "The traffic count on the Portage Glacier Highway is somewhat high for a road in Alaska, with the 2010 traffic count for the Anton Anderson Tunnel being at 234,738 vehicles", high compared to what? I would suggest rewording to remove the comparison that it is high.
     Done
  2. It is factually accurate and verifiable.
    a (references): b (citations to reliable sources): c (OR):
    • References should not be in the lead unless the information is unique there.
     Done unnecessary reference removed.
    • Reference 1 is a dead link.
     Done
  3. It is broad in its coverage.
    a (major aspects): b (focused):
    • Can some details about the physical surroundings be mentioned in the lead?
     Done
    • Can some more historical information be added to the lead?
     Done
    • I would suggest moving the information about the Intermodal Connector Route and National Highway System to the Route description.
     Done
    • I would suggest moving the Tolls section to before the History.
     Done
  4. It follows the neutral point of view policy.
    Fair representation without bias:
  5. It is stable.
    No edit wars, etc.:
  6. It is illustrated by images, where possible and appropriate.
    a (images are tagged and non-free images have fair use rationales): b (appropriate use with suitable captions):
  7. Overall:
    Pass/Fail:

I will put the article on hold for fixes to be made. Dough4872 00:59, 9 May 2012 (UTC)[reply]

I believe the issues have been resolved. - Awardgive, the editor with the msitaken name. 05:28, 12 May 2012 (UTC)[reply]
I think that all new issues have been fixed. - Awardgive, the editor with the msitaken name. 01:12, 13 May 2012 (UTC)[reply]
After some fixes I made myself, I will pass the article. Dough4872 01:21, 13 May 2012 (UTC)[reply]