Talk:Medford/Tufts station/GA1
Appearance
GA Review
[edit]GA toolbox |
---|
Reviewing |
Article (edit | visual edit | history) · Article talk (edit | history) · Watch
Reviewer: Aria1561 (talk · contribs) 21:10, 22 December 2022 (UTC)
The last of the GLX to be reviewed for GA status, and I will be more than delighted to review it. I will have my thoughts ready within the next 7 days. Aria1561 (talk) 21:10, 22 December 2022 (UTC)
GA review (see here for what the criteria are, and here for what they are not) |
---|
|
Overall: |
· · · |
Lead
located at College Avenue in Medford, Massachusetts
– prose states otherwise, stating that it islocated off Boston Avenue near College Avenue
. I suggest changing the sentence in the lead to represent what is stated in the prose, especially since the entrance is located on Boston Avenue and not College Avenue.- Done
- Would it be worth mentioning in the lead that Medford/Tufts serves as the northern terminus for the Green Line E branch?
- Done
Station design
The platform is 8 inches (200 mm) high for accessible boarding on current light rail vehicles (LRVs), and can be raised to 14 inches (360 mm) for level boarding with Type 9 and Type 10 LRVs
– should be changed toraised to 14 inches (360 mm) for future level boarding
for consistency with other GLX articles as well as what is stated in the source.- Done
Railroad stations
the Public Utilities Commission approved a vast set of cuts to Boston and Maine Railroad commuter service
– add B&M abbreviation since it is used later in this section (consistency with other abbreviations used in the article).- Done (by virtue of adding a new sentence higher up)
Previous plans
the BERy indicated plans to built three additional radial subways
– change "built" to "build".- Done
one paralleling the Midland Branch through Dorchester
– add link to Dorchester, Boston.- Done
Consideration was also given to extension past North Cambridge over the Lexington Branch
– add link to Lexington Branch.- Done
These included an extension from Lechmere to Woburn over the Southern Division
– remove link to Woburn as the town was already linked in the previous paragraph.- Done
it would have a branch following the Southern Division to Arlington or Woburn
– add link to Arlington, Massachusetts.- Done
Station planning
and the ability to avoid modifiying the College Avenue and Winthrop Street bridges
– change "modifiying" to "modifying".- Done
and was thus not supported by MassDOT
– add link to MassDOT.- Done
Redesign
- No notes.
Construction
- No notes.
Images
- Looks good, no notes.
References
- Ref 74 is currently dead and needs to be archived.
- Done
Overall
- @Pi.1415926535: Brilliantly written article, only a couple small issues that need fixing and this article will be good to go for GA status. On hold for 7 days. Aria1561 (talk) 01:57, 24 December 2022 (UTC)
- @Aria1561: Thanks for the review! All comments are addressed. Pi.1415926535 (talk) 04:39, 24 December 2022 (UTC)
- Excellent! Passing now. Aria1561 (talk) 05:11, 24 December 2022 (UTC)
- @Aria1561: Thanks for the review! All comments are addressed. Pi.1415926535 (talk) 04:39, 24 December 2022 (UTC)