Jump to content

Talk:Luftnachrichten Abteilung 350

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Updated Legend translations

[edit]
  • Funkaufklärungsführer Reich Signal Intelligence Führer (Leader) [for the] Reich
  • Generalnachrichtenführer Intelligence (Signals) Leader[A 1] General
  • Höherer Kommandeur der Funkaufklärung Higher Commander of Signal Intelligence
  • Funkmessbeobachtung und Stördienst Radar Surveillance and Jamming Service
  • Luftnachrichten-Abteilung Air Signals[A 2] Division
  • Luftnachrichtenregiment Air Signals[A 2] Regiment
  • Oberbefehlshaber der Luftwaffe Commander-in-chief (Supreme Commander) of the Airforce (Luftwaffe)
  • Oberkommando der Luftwaffe Airforce (Luftwaffe) High Command
  • Zentraler Gefechtsstand für Funkauswertung Central Component Headquarters (Joint Operations Center)[A 3] for Radio Analysis

Still to put into diagram. scope_creep (talk) 19:35, 3 August 2017 (UTC)[reply]

This is done. scope_creepTalk 10:49, 24 November 2020 (UTC)[reply]

Struct

[edit]

East is based on sector category, while south is per time range category. Need to normalise east. West has timeline. scope_creep (talk) 21:18, 20 September 2018 (UTC)[reply]

Need to reorganise article near the end, to flatten it. scope_creep (talk) 14:49, 4 November 2018 (UTC)[reply]
All sections are roughly the same, evaluation, liaison, crypt, org. scope_creep (talk) 14:54, 4 November 2018 (UTC)[reply]

Questions

[edit]

What is the Luftwaffe weather unit called? What was the Luftwaffe safety service network?

Progress

[edit]
  • Section 7 - History of operations in the east IF-186
  • Section 7 - Tech ops - Still do decide.
  • Section 6 - History of operations in the south IF-184 - Work on. 4th November 2011.
  • Section 6 - Tech ops, not done.

Languages normalisation

[edit]

Need to normalise signals for signal intelligence, name property. Standardise names, regiment. Standard tables. Need questions list?

scope_creepTalk 01:28, 6 December 2018 (UTC)[reply]

West diagrams to do.

[edit]
  1. Figure 9 needing done. p.1
  2. Figure 12 seems to be missing. p.16 part 2. Started doing this 6/11/2019
  3. Figure 17 p.40 IF-181 part 2

scope_creepTalk 00:39, 6 November 2019 (UTC)[reply]

Fig 12 added. scope_creepTalk 18:39, 6 November 2019 (UTC)[reply]
Fig 9 added. scope_creepTalk 18:29, 7 November 2019 (UTC)[reply]

Plan to finish and split

[edit]
  • Split out the chi-stelle into its own article. checkY scope_creepTalk 10:50, 24 November 2020 (UTC)[reply]
  • Remove mentions of folk who don't have articles, nor never will.
  • Need to discover what was needing done to the other three area. West was completed, but not the three areas.
  • Look to the technical section south and see if that can be split. Can technical articles be created? Is it worth doing it?
  • Can that south technical bit, be split out.

v Look for other bits that can maybe split out. scope_creepTalk 09:52, 23 May 2020 (UTC)[reply]