Jump to content

Talk:Green Line (BART)

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Berryessa

[edit]

Based on the website FAQ's on http://www.vta.org/bart/faq.html#i, there WILL be a Berryessa-Daly City line to the Berryessa Station. Previously, someone mentioned that the Richmond-Fremont line is the only line that will run to San Jose and that the Daly City line will terminate at Warm Springs; that information is false which means two lines will run down in the San Jose BART Extension. This message will also be posted in the Richmond-Fremont Line talk page. Please check the link and include this in this article.

Also notice that this information has been updated, please someone change the rail chart on the right hand screen to include the future stations for the Fremont-Daly City line that are visible on the Richmond-Fremont line. Ryic835 (talk) 05:35, 9 June 2012 (UTC)[reply]

Placement of Daly City first

[edit]

I have not checked whether this is also done on the maps posted on the trains. When I ride the train later today I will see if that was indeed the case.--Jasper Deng (talk) 18:18, 15 March 2017 (UTC)[reply]

The maps on the trains have not been updated. I will check again when Warm Springs has opened.--Jasper Deng (talk) 01:10, 16 March 2017 (UTC)[reply]

Move discussion in progress

[edit]

There is a move discussion in progress on Talk:Bay Area Rapid Transit which affects this page. Please participate on that page and not in this talk page section. Thank you. —RMCD bot 22:32, 10 February 2023 (UTC)[reply]