Jump to content

Talk:Demand flow technology

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Demand Flow Technology verses Lean Philosophy...

where's the formula?

[edit]

Section: 2.9 Takt & Operational Cycle-Time, OP c/t

"Takt-time is the ratio of time to volume at capacity and in DFT is expressed as

Where HE is Effective Hours, S is the number of shifts and DC is the demand at capacity, a daily rate set for design purposes at some point 2 to 5 years into the future."

The formula is missing from this. Should this be replaced with what's listed in the Takt time page?