Demand Flow Technology verses Lean Philosophy...
where's the formula?
[edit]Section: 2.9 Takt & Operational Cycle-Time, OP c/t
"Takt-time is the ratio of time to volume at capacity and in DFT is expressed as
Where HE is Effective Hours, S is the number of shifts and DC is the demand at capacity, a daily rate set for design purposes at some point 2 to 5 years into the future."
The formula is missing from this. Should this be replaced with what's listed in the Takt time page?