idMabin1998 failed CCPM statistics verification
Reference named ibMabin1998 may have failed verification. The following note was left on the article page. I moved it here:
- This reference is incorrect as the statistics quoted related to results of applications of Theory of Constraints methods to manufacturing processes, not Critical Chain applications to projects. Stevenbalderstone 06:28, 25 August 2011 (UTC)
Jojalozzo 19:27, 25 August 2011 (UTC)
Removed it. If co-author of the study says it was used incorrectly, then it was used incorrectly. 172.249.42.134 (talk) 13:43, 23 March 2014 (UTC)