Talk:Bedok Reservoir MRT station/GA1
GA Review
[edit]The following discussion is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.
GA toolbox |
---|
Reviewing |
Article (edit | visual edit | history) · Article talk (edit | history) · Watch
Nominator: ZKang123 (talk · contribs) 06:52, 18 January 2024 (UTC)
Reviewer: CosXZ (talk · contribs) 19:35, 15 April 2024 (UTC)
- @ZKang123: I have some stuff I need you to do under 3B CosXZ (talk) 23:58, 16 April 2024 (UTC)
- Fixed per suggestions, except for "official station code" and "easier access".--01:52, 17 April 2024 (UTC)
- Ok I understand CosXZ (talk) 14:29, 17 April 2024 (UTC)
- Fixed per suggestions, except for "official station code" and "easier access".--01:52, 17 April 2024 (UTC)
GA review (see here for what the criteria are, and here for what they are not) |
---|
|
Overall: |
· · · |
Comments
[edit]1A
[edit]CosXZ (talk) 23:53, 16 April 2024 (UTC)
1B
[edit]lead/lede
[edit]CosXZ (talk) 21:22, 15 April 2024 (UTC)
layout
[edit]CosXZ (talk) 21:39, 15 April 2024 (UTC)
word choice
[edit]CosXZ (talk) 21:50, 15 April 2024 (UTC)
WP:stations guidelines
[edit]CosXZ (talk) 21:34, 15 April 2024 (UTC)
2A
[edit]Looks great CosXZ (talk) 19:35, 15 April 2024 (UTC)
2B
[edit]- [1][2][3][4][5][8][9][11][14][16][17][19][20] primary source
- [6][7][15]
- [10] map
- [12][18] primary source
- [13] company that installed the artwork
Overall looks good CosXZ (talk) 19:35, 15 April 2024 (UTC)
2C
[edit]CosXZ (talk) 23:48, 16 April 2024 (UTC)
2D
[edit]Earwig found nothing too concerning CosXZ (talk) 21:07, 15 April 2024 (UTC)
3A
[edit]CosXZ (talk) 23:23, 16 April 2024 (UTC)
3B
[edit]lead/lede
[edit]- The station was
firstannounced in August 2010 when the DTL Stage 3 stations were revealed.
History
[edit]- The station was
firstannounced on 20 August 2010 along with the 16 stations of the 21-kilometre (13 mi) Downtown line Stage 3 (DTL3) from the River Valley (now Fort Canning) to Expo stations. The line segment was expected to be completed in 2017. A key challenge ofthe station's construction involved the temporarily diversion of an existing canal for the implementation of the diaphragm wall. And link 'diaphragm wall'- The
expandedcanal was restored upon the completion of the station box. - On 31 May 2017, the Land Transport Authority (LTA) announced that the station
, together with the rest of DTL3,would be opened on 21 October that year.
Details
[edit]- The
officialstation code is DT30. - the station design incorporated
boldpalettes and sculpture-inspired designs as part of the "Station in the Park" concept. - Wider fare gates allow
easieraccess for wheelchair users into the station. - The message was a
straightforwardline that Ng hoped to remind commuters how far they are from their dreams. And replace 'line' with 'phrase' - The artist initially proposed a
literalillustration of the water cycle,
4
[edit]CosXZ (talk) 23:34, 16 April 2024 (UTC)
5
[edit]Very stable CosXZ (talk) 19:35, 15 April 2024 (UTC)
6A
[edit]Good copyright CosXZ (talk) 15:46, 16 April 2024 (UTC)
6B
[edit]CosXZ (talk) 15:46, 16 April 2024 (UTC)