Jump to content

Talk:BMT Franklin Avenue Line/GA1

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

GA Review

[edit]
GA toolbox
Reviewing

Article (edit | visual edit | history) · Article talk (edit | history) · Watch

Reviewer: Iazyges (talk · contribs) 17:17, 9 March 2018 (UTC)[reply]

Will start soon. Iazyges Consermonor Opus meum 17:17, 9 March 2018 (UTC)[reply]

Criteria

[edit]
GA Criteria

GA Criteria:

  • 1
    1.a checkY
    1.b checkY
  • 2
    2.a checkY
    2.b checkY
    2.c checkY
    2.d checkY (Highest is 29.1%, due to incidental parallels)
  • 3
    3.a checkY
    3.b checkY
  • 4
    4.a checkY
  • 5
    5.a checkY
  • 6
    6.a checkY
    6.b checkY
  • No DAB links checkY
  • No Dead links ☒N:
    Ref 19: " "MTR 10, Franklin Ave Shuttle Site of Leafletting Action". www.tstc.org. Tri-State Transportation Campaign. November 9, 1994. Retrieved June 21, 2016" is dead.
 Done--Kew Gardens 613 (talk) 18:07, 29 March 2018 (UTC)[reply]

Prose Suggestions

[edit]

Please note that none of these changes are required, only suggestions.

  • All service is provided full-time by the Franklin Avenue Shuttle. suggest you change this to Service is full-time, and provided by Franklin Avenue Shuttle
 Done--Kew Gardens 613 (talk) 18:07, 29 March 2018 (UTC)[reply]
  • Rehabilitation suggest you change this section title to Restoration
 Done--Kew Gardens 613 (talk) 18:07, 29 March 2018 (UTC)[reply]