The Taishir Hydro Power Station (Mongolian: Тайширын Усан Цахилгаан Станц) is a hydroelectric power station in Govi-Altai Province, Mongolia.
History
[edit]The power station was commissioned in 2008.[1]
Technical specification
[edit]The water intake for the power station comes from Gegeen Lake. The power station has an installed capacity of 11 MW.[2]
Finance
[edit]The power station and its dam was constructed with a cost of US$39 million. It was funded by Kuwait Fund for Arab Economic Development and the United Arab Emirates.[3]
See also
[edit]References
[edit]- ^ Lkhasuren, Misheel (20 October 2021). "Hydropower plant project is crucial for energy independence". The UB Post. Retrieved 4 August 2023.
- ^ Government of Mongolia (December 2015). "Scaling-Up Renewable Energy Programme (SREP): Investment Plan for Mongolia" (PDF). Climate Investment Funds. Retrieved 13 December 2023.
- ^ Robinson, Paul (29 July 2017). "Taishir Dam and Reservoir on the Zavkhan River: Images and Impressions from Herders Affected by the Dam and Reservoir" (PDF). Retrieved 4 August 2023.