Szwedzka metro station
Appearance
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Praga-Północ Warsaw Poland | ||||||||||
Coordinates | 52°15′48″N 21°02′43″E / 52.2634°N 21.0453°E | ||||||||||
Operated by | ZTM Warszawa | ||||||||||
Line(s) | 135 N14, N64 | ||||||||||
Platforms | 1 | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Fare zone | 1 | ||||||||||
History | |||||||||||
Opened | 15 September 2019 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Szwedzka is a Warsaw Metro station in Warsaw's Praga-Północ district. It is part of the extension of Line M2 from Dworzec Wileński to Targówek, with construction started in 2016. All three stations opened on September 15, 2019.[1]
History
[edit]On March 11, 2016, a 1 billion zł (€225 million) contract was awarded to the Italian company, Astaldi to build the first phase of the North-East second subway line extension with 3.2 kilometres (2.0 mi) of track and 3 stations: Szwedzka, Targówek and Trocka. On April 30, construction on Szwedzka station started, and on May 2, the other two stations started construction.
Construction site
[edit]References
[edit]- ^ "II linia metra - Metro". www.metro.waw.pl (in Polish). Retrieved 2018-01-23.
External links
[edit]- Detailed map of Line M2 from official Warsaw Metro site
- Media related to Szwedzka metro station at Wikimedia Commons