Jump to content

Swan View Tunnel

From Wikipedia, the free encyclopedia

Swan View Tunnel
Eastern portal in January 2006
Overview
LocationSwan View, Western Australia
Coordinates31°52′59.3″S 116°4′10.3″E / 31.883139°S 116.069528°E / -31.883139; 116.069528
StatusConverted to rail trail
Start31°52′56.1″S 116°4′15.5″E / 31.882250°S 116.070972°E / -31.882250; 116.070972 (North-eastern Portal)
End31°53′2.8″S 116°4′5.0″E / 31.884111°S 116.068056°E / -31.884111; 116.068056 (South-western Portal)
Operation
Opened22 February 1895
Closed13 February 1966
OwnerDepartment of Parks & Wildlife
OperatorWestern Australian Government Railways
Technical
Line length340 metres
No. of tracks1
Track gauge1,067 mm (3 ft 6 in)

The Swan View Tunnel is a former railway tunnel located on the southern side of the Jane Brook valley in the outer Perth suburb of Swan View in the John Forrest National Park on the edge of the Darling Scarp. After its closure as a railway tunnel, it reopened as part of the John Forrest Heritage Trail, a rail trail.

Prior to the construction of tunnels and the sinking of the Subiaco railway station in 1999, the Swan View Tunnel was the only tunnel on the Western Australian railway network.

Construction

[edit]
Western portal in January 2006

Swan View Tunnel was built on an alignment which replaced the original Eastern Railway passing through Smiths Mill, (now Glen Forrest), and Mundaring. The project to build the new line, including the Swan View Tunnel, was managed by the Western Australian Government Railways Engineer-in-Chief, C. Y. O'Connor.

The tunnel was erroneously stated in contemporary reporting to be 13 chains long, which is 261.5184 m (858 ft).[1] Modern authorities give the length as 340 m (1,120 ft).[2] Inspection of open source aerial imagery confirms that the tunnel is 340.7 metres (1,118 ft) in length.

Initial exploratory surveys of the new Jane Brook deviation were commissioned in 1891 by CY O'Connor. The aim was to find a route over the Darling range to replace the one-in-30 ruling grade existing Eastern Railway section in the Helena Valley.

In 1892, O'Connor recommended to the first Minister for Railways in Western Australia, HW Venn, that a Jane Brook option be selected. His advice was not followed, with an alignment adopted that followed the Jane Brook Valley until a large granite hill was encountered, requiring a drill and blast tunnel to penetrate through the hill. The successful tender for the tunnel construction came from a South Australian firm, Smeaton and Hedges. The tendered price was £47,608, with an expected completion time of 12 months. The engineer in charge of construction was John Muir who had also surveyed the prospective new route, designed the tunnel, and identified that broken rock spoil from the tunnel could be used to create nearby embankments, a prudent move on Muir's part as the principal means of shifting spoil in the 1890s was by draft horse hauling mould board and plough, followed by tipping from horse drawn carts.

Work began in 1894, with tunnelling operations commencing from each end and the two tunnel drives meeting on 18 April 1895.[3] The tunnel opened on 22 February 1896, significantly over-budget and over-schedule.[4][5] The unstable nature of the jointed and sheared granite, along with clay seams, caused difficulties during construction of the tunnel. Multiple rock falls occurred, which required further excavation at considerable cost. Because of the likelihood of further rock falls, the tunnel had to have masonry walls and was fully brick-lined with over 330,000 bricks, increasing construction time and costs and reducing the inner tunnel diameter.

The deviation from the original railway line, and the tunnel in particular, was a "significant technical feat for the time"; Engineers Australia awarded the deviation an Engineering Heritage Marker as part of its Engineering Heritage Recognition Program.[6]

Problems

[edit]

The tunnel was feasible for 1890s style locomotion, with some problems from smell and smoke accumulation, however the advent of larger, more powerful steam locomotives soon exposed the limitations of the tunnel. The tunnel's small diameter combined with the steep gradient (1:49), lack of ventilation shafts and typical requirement for 2 engines to haul heavily laden trains up the steep gradient caused smoke accumulation. Incidents involving near-asphyxiation of train crews started in 1896, and continued throughout the tunnel's operating life. Standard procedure for engine crews was to cover their heads with a water soaked hessian bag and to stay as low as possible on the footplate.[7][8][9] The first serious incident of this nature was in 1903.[10]


The tunnel's design was incompatible with the ASG class Garratt steam locomotives used by the Western Australian Government Railways in the 1940s. The subsequent Royal Commission into the ASG dealt with design of the locomotive, and the very dangerous clearances.[11][12]

Industrial trouble arose in regard to the taking of the ASG locomotives through the Swan View tunnel. This tunnel was constructed many years ago and provides very little clearance for a modern locomotive. In the case of the ASG the distance between the sides and top of the locomotive and the structure of the tunnel is a matter of inches.[13][14]

The worst accident in the tunnel was on 5 November 1942, when both drivers and firemen were overcome by carbon monoxide, one driver dying, when a fully laden double-header train passed through the tunnel at walking pace. A bale of chaff that had been poorly loaded on a previous train had fallen onto the track in the tunnel. When Number 97 goods train from Perth to Northam passed over the bale of chaff, it burst open, distributing chaff over the tracks. When the driving wheels passed over the chaff, the engines lost traction and stalled. The last act of the driver before the crews fell unconscious from smoke and carbon monoxide poisoning was to set the engines into reverse. Consequently the train steamed back down the line and crashed at Swan View Station, with the death of driver Tom Beer.[15][16][17] Further cases occurred in 1943[18] and 1944 on up trains.[19]

Subsequent industrial strikes, a Royal Commission and union agitation for the locomotives' withdrawal was a significant issue in the 1940s.[20][21][22][23]

Deviation

[edit]

Between 1934 and 1945, a signal cabin was located at Tunnel Junction, on the eastern end of the tunnel, for managing the transition from the tunnel's single line to the dual lines of the system.[24]

The single line tunnel was considered unsafe for eastbound (climbing) trains.[25][26] Following the events of the early 1940's, planning commenced immediately to alleviate the bottleneck caused by the tunnel. Several options were considered, including blasting the top off the tunnel and turning it into a cutting. However it was decided to create a sweeping deviation with a new cutting west of the tunnel, closer to Jane Brook, on the northern side of the hill that the tunnel passed through.

It was known as the Deviation, with construction commencing in 1944, and completion on 28 November 1945. Rockfall problems similar to, if not worse than, those of the tunnel were encountered during construction and severely restricted the subsequent use of the cutting.

"Construction involved a deep cut in granite, some 450 m long, in which protection from rock falls was essential in view of the character of the granite exposed after the cut had been excavated. Steel fences, 2.5 m high with supports 9.9 m apart, were therefore erected on both sides of the cut. The 16 wires forming the fences were in continuous electrical signalling circuits and a simple but effective system of internal electrical interlocking was installed which made the protection system completely automatic. If a wire was broken by falling rock or if a battery or circuit failed, two relays became de-energised, and the signal controlling the line in the cut was placed at danger. An indicator in the Swan Valley signal box showed the operator that a rockfall (or other failure) had occurred. The control signal could only be reset with a special key at the signal itself."[27][5][28] The diversion was completed on 25 November 1945.[29]

Railway closure

[edit]

The railway line through the tunnel was lifted after the closing of the older and steeper Eastern Railway and the opening of the Avon Valley diversion that opened in February 1966. The new Avon Valley deviation route involved little rock work and flat gradients that had been initially favoured by CY O'Connor.

After the 1960s, gates/doors[which?] were put at either end of the tunnel though these were later removed.[30]

The tunnel remains intact and has reopened as part of the John Forrest Heritage Trail, part of the larger Railway Reserve Heritage Trail.[31] During the 1990s, the government authority in which the tunnel land was vested, the Department of Environment and Conservation allowed a number of night time "ghost walks" in the tunnel as part of the Hills Forest programmes.

Engineering Geology

[edit]

The tunnel and first open cut deviation are constructed in Archaean meta-granite (slightly altered, coarse-grained granite, in places pegmatitic). This rock mass has been intruded by dolerite dykes which are more deeply weathered than the granites and in places active swelling clay (montmorillonitic) seams have formed.

The main structural problems come from a combination of shears and various types of jointing on the rock mass.

There are 2 sets of sub-vertical conjugate (formed at the same time) shears about 135° apart. These are expressed as bands of closely spaced fractures that have allowed water entry, in some places producing clay seams. In addition there are several types of joints:

(i) sheet joints or stress relief joints, which are continuous and sub-parallel to the topography formed by the erosion of the deep valley adjacent (ii) cooling joints, which are prominent in the intruding dolerite (iii) tectonic joints (iv) blast damage joints (rose of joints) caused by over-blasting

The net result is that a blocky rock mass has been produced with some vertical and sub-horizontal clay seams which allow rock falls, block gliding, rock slides and toppling type failures.

References

[edit]
  1. ^ "Our Illustrations. The Only Railway Tunnel in the State". Western Mail. 23 May 1903.
  2. ^ "inHerit - State Heritage Office".
  3. ^ Higham, Geoffrey (2007). Marble Bar to Mandurah: A history of passenger rail services in Western Australia. Bassendean: Rail Heritage WA. p. 22. ISBN 978-0-9803922-0-3.
  4. ^ Bayley, William (1974). Tunnels on Australian Railways. Bulli: Austrail Publications. pp. 37–38. ISBN 0-909597-16-2.
  5. ^ a b Eastern Railway Deviation Heritage Council of WA
  6. ^ "Eastern Railway Deviation". Engineers Australia. Retrieved 27 April 2020.
  7. ^ Tobin, Jack 1962 "The Swan View Tunnel" The Westland September 1999 p.7-11
  8. ^ "SWAN VIEW TUNNEL". Westralian Worker. No. 1781. Western Australia. 24 December 1942. p. 1. Retrieved 20 January 2019 – via National Library of Australia.
  9. ^ "Swan View Tunnel". Westralian Worker. No. 1785. Western Australia. 22 January 1943. p. 1. Retrieved 20 January 2019 – via National Library of Australia.
  10. ^ Swan Express 2 October 1909 p.3a, 4a. Articles on ventilation problems in the tunnel
  11. ^ "GARRATT ENGINES". Daily Mercury. Vol. 79, no. 267. Queensland, Australia. 8 November 1945. p. 1. Retrieved 20 January 2019 – via National Library of Australia. – specifically unions requesting the commissioner to travel through the tunnel in an ASG to understand the context
  12. ^ "JUDGE TO RIDE ON GARRATT FOOTPLATE". Tweed Daily. Vol. XXXII, no. 271. New South Wales, Australia. 8 November 1945. p. 1. Retrieved 20 January 2019 – via National Library of Australia.
  13. ^ page eleven of [1] see also Western Australia. Royal Commission Appointed to Inquire into Australian Standard Garratt Locomotive; Wolfe, Albert Asher (1946), Report of the Royal Commission Appointed to Inquire into Australian Standard Garratt Locomotive, William H Wyatt, Govt. Printer, retrieved 20 January 2019
  14. ^ see also "GARRATT ENGINES". Kalgoorlie Miner. Vol. 52, no. 13, 827. Western Australia. 13 November 1946. p. 3. Retrieved 20 January 2019 – via National Library of Australia.
  15. ^ "Engine Crew Collapse In Swan View Tunnel". Daily News. Vol. LXI, no. 21, 159 (HOME ed.). Western Australia. 27 January 1943. p. 5. Retrieved 20 January 2019 – via National Library of Australia.
  16. ^ "Swan View Smash". The West Australian. Perth. 10 December 1942. p. 7. Retrieved 18 February 2015.
  17. ^ Duxbury, George (2001) Rail against time Landscope, Autumn 2001, p.37-40
  18. ^ "Swan View Tunnel". The Albany Advertiser. Vol. 16, no. 1664. Western Australia. 28 January 1943. p. 1. Retrieved 20 January 2019 – via National Library of Australia.
  19. ^ "SWAN VIEW TUNNEL". The West Australian. Vol. 60, no. 18, 024. Western Australia. 17 April 1944. p. 4. Retrieved 20 January 2019 – via National Library of Australia.
  20. ^ Barry, Kevin (June 1977), "Labour turmoil: the Garratt strike of 1946", Social Sciences Forum, 4 (June 1977): 26–43, retrieved 20 January 2019
  21. ^ Barry, Kevin (December 1996), "Labour divided: the Garratt strike of 1946", Papers in Labour History (17): 46–67, ISSN 1030-6218
  22. ^ Oliver, Bobbie (2012), "The Australian Standard Garratt: The engine that brought down a government", Journal of Transport History, Manchester University Press, doi:10.7227/TJTH.33.1.3, ISSN 0022-5266, S2CID 155061401
  23. ^ Troy, Paddy (December 1996), "Thirty years on: Paddy Troy's perspective on the ASG strike. [Comments made about Kevin Barry's 1975 thesis published in this issue as: Barry, Kevin. Labour divided: the Garratt strike of 1946]", Papers in Labour History (17): 68–69, ISSN 1030-6218
  24. ^ "Swan View Tunnel Deviation". The West Australian. Perth. 7 December 1944. p. 6. Retrieved 9 October 2012 – via National Library of Australia.
  25. ^ "Swan View Tunnel Crisis". The Daily News (Late Sports ed.). Perth. 26 February 1944. p. 8. Retrieved 9 October 2012 – via National Library of Australia.
  26. ^ "Swan View Tunnel". The Daily News (Home ed.). Perth. 6 January 1943. p. 9. Retrieved 9 October 2012 – via National Library of Australia.
  27. ^ Handbook of geology in civil engineering by Leggett and Karrow, 1962(McGraw Hill)
  28. ^ "Trains Go Round Swan View Tunnel". The Daily News (City Final ed.). Perth. 26 November 1945. p. 7. Retrieved 9 October 2012 – via National Library of Australia.
  29. ^ WAGR Publicity (N.D.) Welcome to the Westland, Western Australian Government Railways Overnight Express and connecting link for interstate travel
  30. ^ Ellis, David 1997 "Terror tunnel" South Western Times 8 April 1997 page 30
  31. ^ Railway Reserve Heritage Trail Shire of Mundaring

Bibliography

[edit]
  • Elliot, Ian (1983). Mundaring – A History of the Shire (2nd ed.). Mundaring: Mundaring Shire. ISBN 0-9592776-0-9.
  • Watson, Lindsay (1995). The railway history of Midland Junction : commemorating the centenary of Midland Junction, 1895–1995. Swan View, W.A: L & S Drafting in association with the Shire of Swan and the Western Australian Light Railway Preservation Association. ISBN 0-646-24461-2.

Further reading

[edit]