Steel Express
Appearance
Overview | |||||
---|---|---|---|---|---|
Service type | Express | ||||
Locale | West Bengal & Jharkhand | ||||
First service | 1 April 1970 | ||||
Current operator(s) | South Eastern Railways | ||||
Route | |||||
Termini | Howrah (HWH) Tatanagar (TATA) | ||||
Stops | 6 as 12814 5 as 12813 | ||||
Distance travelled | 250 km (155 mi) | ||||
Average journey time | 4 h 10 m as 12814 3 h 55 m as 12813 | ||||
Service frequency | Daily | ||||
Train number(s) | 12813 / 12814 | ||||
On-board services | |||||
Class(es) | AC Executive Chair Car, AC Chair, 2nd Sitting, Unreserved | ||||
Seating arrangements | Yes | ||||
Sleeping arrangements | No | ||||
Catering facilities | On-board catering, E-catering | ||||
Observation facilities | Large windows | ||||
Other facilities | Below the seats | ||||
Technical | |||||
Rolling stock | LHB coach | ||||
Track gauge | 1,676 mm (5 ft 6 in) | ||||
Operating speed | 60 km/h (37 mph) as 12814 63 km/h (39 mph) as 12813 | ||||
|
The 12813 / 12814 Steel Express is a Superfast class train operated by Indian Railways connecting Kolkata with the steel-producing city Jamshedpur in Jharkhand state.
It has a Single Dedicated Rake whose Primary Maintenance is done at Tatanagar coaching depot.
Rake Composition
[edit]It is running with LHB coach from 11 June 2018. Advance Reservation Period is of 30 days. Coach composition (22 coaches) is as follows-
- 1 Seating cum Luggage coach
- 1 Power Generator Car (EOG)
- 3 Unreserved accommodation
- 12 Second Sitting Coaches
- 4 AC Chair Car
- 1 Executive Chair Car
Loco | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SLRD | GEN | D12 | D11 | D10 | D9 | D8 | D7 | D6 | D5 | D4 | D3 | D2 | D1 | C4 | C3 | C2 | C1 | E1 | GEN | GEN | EOG |
Route & halts
[edit]Traction
[edit]It is hauled by a Tatanagar based WAP-7 locomotive from end to end.
Time Table
[edit]From Tatanagar to Howrah- 12814. The train starts from Tatanagar every day
Station code | Station name | Arrival | Departure |
---|---|---|---|
TATA | Tatanagar Jn | -- | 06:10 |
RHE | Rakha Mines | 06:33 | 06:35 |
GTS | Ghatsila Jn | 06:47 | 06:49 |
CKU | Chakulia Jn | 07:12 | 07:14 |
JGM | Jhargram | 07:35 | 07:37 |
KGP | Kharagpur Jn | 08:18 | 08:20 |
SRC | Santragachi Jn | 09:38 | 09:40 |
HWH | Howrah | 10:20 | -- |
From Howrah to Tatanagar – 12813. The train starts from Howrah every day.
Station code | Station name | Arrival | Departure |
---|---|---|---|
HWH | Howrah | -- | 17:25 |
KGP | Kharagpur Jn | 18:58 | 19:00 |
JGM | Jhargram | 19:36 | 19:38 |
CKU | Chakulia Jn | 20:00 | 20:02 |
GTS | Ghatsila Jn | 20:21 | 20:23 |
RHE | Rakha Mines | 20:38 | 20:40 |
TATA | Tatanagar Jn | 21:20 | -- |
External links
[edit]- Indian Rail information site
- https://indiarailinfo.com/train/steel-express-12813/1588
- https://indiarailinfo.com/train/1589
References
[edit]