Jump to content

SESC-Pompeia (São Paulo Metro)

From Wikipedia, the free encyclopedia
SESC-Pompeia
construction works in 2022
General information
LocationAv. Pompeia × R. Venâncio Aires
Perdizes
Brazil
Coordinates23°31′37″S 46°40′59″W / 23.527042°S 46.683056°W / -23.527042; -46.683056
Owned by Government of the State of São Paulo
Operated by LinhaUni
PlatformsSide platforms
Construction
Structure typeUnderground
AccessibleYes
History
Opening2026
Previous namesPompeia
Services
Preceding station São Paulo Metro Following station
Água Branca
towards Brasilândia
Line 6
(under construction)
Perdizes
towards São Joaquim
Track layout

SESC-Pompeia will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side.

The station will be located in the confluence between Avenida Pompeia and Rua Venâncio Aires, where it will attend Allianz Parque and Bourbon Shopping Mall, situated between the districts of Barra Funda and Perdizes.[1]

The construction of the station began in 2016, when the opening date was estimated to mid-2020.[2] Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021,[3] time kept in October 2017, when the resume of the construction was announced for the beginning of 2018.[4][5][6] In September 2016, the construction was suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo started negotiations with international companies, including Spanish Acciona[7] and Chinese China Railway Construction Corporation.[8] On 4 July 2020, the State Government of São Paulo signed a deal with Spanish company Acciona to conclude the construction of the line and operate it, in a Public Private Partnership, through Linha Universidade dealership.[9][10]

Characteristics

[edit]

Buried station with side platforms, structure with apparent concrete and support rooms at-grade. It will have access for people with disabilities.[11][12][13]

References

[edit]
  1. ^ "Empreendimentos do Metrô - Maio/2013" (PDF) (in Portuguese). Companhia do Metropolitano de São Paulo. May 2013. Archived from the original (PDF) on 20 December 2016. Retrieved 25 January 2020.
  2. ^ Meier, Ricardo (22 June 2016). "Linha 6 já tem três estações em obras, mas data de inauguração sofrerá atraso" (in Portuguese). Metrô CPTM. Retrieved 25 January 2020.
  3. ^ Palhares, Isabela (22 June 2016). "Linha 6-Laranja do Metrô será entregue em 2021, diz Alckmin" (in Portuguese). Estadão. Retrieved 25 January 2020.
  4. ^ Leite, Fabio (4 October 2017). "Grupo chinês deve 'comprar' Linha 6 do Metrô e retomar obra parada" (in Portuguese). Estadão. Retrieved 25 January 2020.
  5. ^ Santiago, Tatiana (22 June 2016). "Linha 6-Laranja do Metrô de SP será entregue com um ano de atraso" (in Portuguese). G1. Retrieved 25 January 2020.
  6. ^ Lobo, Renato (6 February 2017). "Metrô amplia prazo das obras da Linha 6-Laranja" (in Portuguese). Via Trólebus. Retrieved 25 January 2020.
  7. ^ Lobo, Renato (23 January 2020). "Doria se reúne com possível futuro operador da Linha 6-Laranja do Metrô" (in Portuguese). Via Trólebus. Retrieved 25 January 2020.
  8. ^ Meier, Ricardo (19 October 2019). "Empresa chinesa CR20 teria fechado acordo para assumir Linha 6-Laranja" (in Portuguese). Metrô CPTM. Retrieved 25 January 2020.
  9. ^ Cunha, Joana (4 July 2020). "Espanhóis assinam contrato para retomar obra da linha 6 do metrô de SP" (in Portuguese). Folha de S. Paulo. Retrieved 6 July 2020.
  10. ^ "Concessionária "Linha Universidade" deve assumir lugar da Move São Paulo na Linha 6-Laranja de metrô" (in Portuguese). Metrô CPTM. 28 April 2020. Retrieved 18 July 2022.
  11. ^ "Estação SESC-Pompeia" (PDF) (in Portuguese). Move São Paulo. 14 July 2011. Archived from the original (PDF) on 29 April 2016. Retrieved 30 January 2020.
  12. ^ "Figura da Estação SESC-Pompeia" (PDF) (in Portuguese). Companhia do Metropolitano de São Paulo. Retrieved 30 January 2020.
  13. ^ "Estação SESC Pompeia - Linha 6-Laranja - Projeto Básico" (in Portuguese). Galeria da Arquitetura. Retrieved 30 January 2020.
[edit]