Rahate Colony metro station
Appearance
The topic of this article may not meet Wikipedia's notability guideline for geographic features. (November 2021) |
Rahate Colony | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Nagpur Metro station | |||||||||||
General information | |||||||||||
Location | Vasant Nagar, Nagpur, Maharashtra 440020 | ||||||||||
Coordinates | 21°07′40″N 79°04′33″E / 21.12774°N 79.07572°E | ||||||||||
Owned by | Maharashtra Metro Rail Corporation Limited (MAHA-METRO) | ||||||||||
Operated by | Nagpur Metro | ||||||||||
Line(s) | Orange Line | ||||||||||
Platforms | Side platform Platform-1 → Automotive Square Platform-2 → Khapri | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated, Double track | ||||||||||
Platform levels | 2 | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 22 October 2020 | ||||||||||
Electrified | 25 kV 50 Hz AC overhead catenary | ||||||||||
Services | |||||||||||
| |||||||||||
|
Rahate Colony is an elevated metro station on the North - South corridor of the Orange Line of Nagpur Metro in the city of Nagpur, Maharashtra. This serves the Rahate Colony area of Nagpur. It was opened on 22 October 2020.[1][2][3]
Station layout
[edit]Rahate Colony track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms
|
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound |
Towards → Khapri Next Station: Ajni Square | |
Platform 1 Northbound |
Towards ← Automotive Square Next Station: Congress Nagar | |
Side platform | Doors will open on the left | ||
L2 |
Entry/Exit
[edit]This section is empty. You can help by adding to it. (August 2023) |
See also
[edit]References
[edit]- ^ "Nagpur Metro's Double Decker Viaduct Inaugurated". The Metro Rail Guy. 16 November 2020. Retrieved 26 November 2021.
- ^ "CMRS gives safety node to launch metro services on four new stations in Nagpur". Urban Transport News. Retrieved 26 November 2021.
- ^ Roy, Ashish. "Two months pass but no new Metro station opens". The Times of India. Retrieved 26 November 2021.