Jump to content

Quzhou–Ningde railway

From Wikipedia, the free encyclopedia
Quzhou–Ningde railway
Overview
StatusOperational
Termini
Stations13
Service
TypeHeavy rail
History
Opened27 September 2020
Technical
Line length379 km (235 mi)
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed160 km/h (99 mph)

The Quzhou–Ningde railway is a single-track electrified railway in China. The combined passenger and freight line is 379 kilometres (235 mi) long and has a design speed of 160 kilometres per hour (99 mph). The journey time is 5 hours and 27 minutes.[1]

History

[edit]

Initially, the railway was expected to begin construction in 2011 and to have double-track with a line-speed of 200 kilometres per hour (120 mph).[2] Construction on a single-track railway began in 2015. The line began operation on 27 September 2020.[1]

Stations

[edit]

The line has the following passenger stations:[1]

References

[edit]
  1. ^ a b c "衢宁铁路9月27日开通运营 浙闽8县市结束不通铁路历史 - 南平新闻 - 东南网". np.fjsen.com. Retrieved 2020-10-01.
  2. ^ "浙江福建明年开建"衢宁铁路"(图)_网易新闻中心". 2014-11-07. Archived from the original on 2014-11-07. Retrieved 2020-10-01.