Jump to content

Qalqaman, Almaty

From Wikipedia, the free encyclopedia
Kalkaman
Almaty Metro rapid transit station
General information
Owned byAlmaty Metro
Line(s)Line 1
Platforms1
Other information
StatusPlanned
History
Opened2025[1]
Services
Preceding station The logo of Almaty Metro. Almaty Metro Following station
Saryarqa First Line
(planned)
Avtovokzal
Terminus

Kalkaman (Kazakh: Қалқаман) is a planned Line 1 station of Almaty Metro.[2][3] The construction of the station is expected to start in 2019[4] and it will be located on Ashimov Street between Elibaev Street and Bayzak Batyr at the intersection of Abay Avenue and Momyshuly Street.

References

[edit]
  1. ^ "Названа точная дата ввода новых станций метро в Алматы". www.asmetro.ru. 27 November 2018. Retrieved 2023-03-21.
  2. ^ "2 new underground stations to be put into service in Almaty by 2020". lenta.inform.kz. 21 November 2016.
  3. ^ "Almaty metro extends west". Railway Gazette. 22 April 2015.
  4. ^ "Здравствуйте! В каком году планируется запуск станции "Калкаман", и далее станции "Западный"?".
Almaty Metro Line A
Apple orchard
Planned ↑
MPD-1 «Raiymbek batyr»
Raiymbek batyr
Zhibek Joly  -  Dostyk
Almaly
Abay
Baikonur
Auezov Theater
Alatau  -  Alatau 2
Sayran
Moskva
Saryarqa
Bauyrjan Momyshuly
Opening ca. 2027 ↓
Qalqaman