Pucheng–Meizhou railway
Appearance
Pucheng–Meizhou railway | |
---|---|
Overview | |
Native name | 浦梅铁路 |
Status | Partially open |
Termini | |
Service | |
Type | Heavy rail |
History | |
Opened | 30 September 2021 (Jianningxian–Guanzhishan) |
Technical | |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 50 Hz 25,000 V |
Operating speed | 160 km/h (99 mph) |
The Pucheng–Meizhou railway (Chinese: 浦梅铁路) is a railway line in China. It has a maximum speed of 160 kilometres per hour (99 mph).[1]
History
[edit]Tracklaying between Jianning and Guanzhishan was completed in December 2020.[2] The line had been expected to open in June 2021. The 162-kilometre (101-mile) section between Jianningxian and Guanzhishan opened on 30 September 2021.[1][3]
References
[edit]- ^ a b "刚刚!浦梅铁路建宁至冠豸山段正式开通" (in Chinese). 网易. 1 October 2021. Retrieved 1 October 2021.
- ^ "浦梅铁路建宁至冠豸山段全线铺轨贯通-锦程国际物流". www.jc56.com. Retrieved 2 January 2021.
- ^ "浦梅铁路建宁至冠豸山段今日在龙岩开工建设". 21 April 2016. Retrieved 1 October 2021.