Portal:South East England/On This Day/November 14
Appearance
2007: The Channel Tunnel Rail Link was completed and rebranded High Speed 1 (HS1), with Eurostar trains terminating at St Pancras instead of Waterloo.
2007: The Channel Tunnel Rail Link was completed and rebranded High Speed 1 (HS1), with Eurostar trains terminating at St Pancras instead of Waterloo.