Oiticica Dam
Appearance
This article needs additional citations for verification. (October 2013) |
Oiticica Dam | |
---|---|
Location | Jucurutu, Jardim de Piranhas, São Fernando |
Coordinates | 6°09′18″S 37°07′20″W / 6.15500°S 37.12222°W |
Construction began | 2013 |
Opening date | Unknown |
Construction cost | U$150 mi |
Owner(s) | DNOCS |
Reservoir | |
Creates | Oiticica reservoir |
Total capacity | 556,000,000 m³ |
The Oiticica Dam is an earth fill embankment dam currently under construction between the rivers Seridó and Piranhas-Açu, in the southwest Brazilian state of Rio Grande do Norte. The main purpose is water storage. Its construction began in 2013 and was initially scheduled for completion in August 2015. It is projected to be the third largest man-made dam in Rio Grande do Norte.[1] Construction suffered various delays, and by July 2019, only 74% of the work is complete.[2]
References
[edit]- ^ "Empreendimento: Barragem Oiticica - RN - PAC 2". Archived from the original on October 29, 2013. Retrieved October 28, 2013.
- ^ "Barragem de Oiticica esta com 74% concluida". Tribuna do Norte. July 16, 2019.