Jump to content

Northern Gas Pipeline

From Wikipedia, the free encyclopedia

Northern Gas Pipeline
Location
CountryAustralia
StateNorthern Territory, Queensland
General directionWest-east
FromTennant Creek
ToMount Isa
General information
Typenatural gas
OwnerJemena
OperatorJemena
Technical service providerGPA Engineering
ContractorsMcConnell Dowell
Commissioned2018
Technical information
Length622 km (386 mi)

The Northern Gas Pipeline is a gas transmission pipeline in Australia. It runs 622 kilometres (386 mi) from Tennant Creek in the Northern Territory to Mount Isa in Queensland. It took 18 months to construct, and was completed in December 2018.[1]

The Northern Territory already had production facilities offshore, feeding into processing facilities near Darwin, and the bi-directional Amadeus Gas Pipeline running north–south through the Territory connecting to the Amadeus Basin southwest of Alice Springs.[2]

North East Gas Interconnector

[edit]

The Northern Gas Pipeline addresses a requirement known as the North East Gas Interconnector (NEGI) before it was built. The purpose of the NEGI is to provide a way to transport gas from Northern Territory production to eastern Australian consumers. Options for the NEGI included the Tennant Creek to Mount Isa route that has been built and an alternate course that would have connected from Alice Springs to Moomba in South Australia. There were four proponents invited to bid for the project,[3] with two preferring each route.[4] The successful tender was from Jemena to build and operate the pipeline, to link Tennant Creek to Mount Isa.[5]

References

[edit]
  1. ^ Beavan, Katrina (14 December 2018). "Northern Territory on cusp of becoming gas centre of Australia as gas pipeline opens". ABC News. Retrieved 17 December 2018.
  2. ^ "Amadeus Gas Pipeline". APA Group. Retrieved 18 December 2018.
  3. ^ Utility Journalist (20 July 2015). "Tender: North East Gas Interconnector Pipeline". Utility magazine. Monkey Media. Retrieved 18 December 2018.
  4. ^ "North East Gas Interconnector (NEGI) pipeline dilemma". iMINCO. 17 November 2015. Retrieved 18 December 2018.
  5. ^ "Jemena to build North East Gas Interconnector". Jemena. 2015. Retrieved 18 December 2018.