Muri (無理) is a Japanese word meaning "unreasonableness; impossible; beyond one's power; too difficult; by force; perforce; forcibly; compulsorily; excessiveness; immoderation",[1] and is a key concept in the Toyota Production System (TPS) as one of the three types of waste (muda, mura, muri).[2]

A direct example of Muri is asking workers to stay focused for a period exceeding 8 hours a day or expecting a machine to produce more than it can in a given time.

Some of the most common reasons why production systems experience overburdening:[citation needed]

  • Unmeasured system capacity, despite assigning production expectations in set numbers
  • A suboptimal technical condition of used machines, or untrained staff
  • Poor communication across the team and manager

Avoidance of muri in Toyota manufacturing

[edit]

Muri is one of three types of waste (muda, mura, muri) identified in the Toyota Production System. Waste reduction is an effective way to increase profitability.

Muri can be avoided through standardized work. To achieve this a standard condition or output must be defined to assure effective judgment of quality. Then every process and function must be reduced to its simplest elements for examination and later recombination. The process must then be standardized to achieve the defined condition. This is done by taking simple work elements and combining them, one-by-one into standardized work sequences. In manufacturing, this includes:

  • Work flow, or logical directions to be taken,
  • Repeatable process steps and machine processes, or rational methods to get there, and
  • Takt time (combined with production/demand leveling to provide for reasonable lengths of time and endurance allowed for a process e.g. if the takt is 10 minutes while there is no realistic way for a process to do its work in less than 10 minutes, muri is the natural outcome).

When everyone knows the standard condition, and the standardized work sequences, the results observed include:

  • Heightened employee morale (due to close examination of ergonomics and safety)
  • Higher quality
  • Improved productivity
  • Reduced costs

References

[edit]
  1. ^ Kenkyusha's New Japanese-English Dictionary (2003), 5th edition, Tokyo: Kenkyusha, p. 2537.
  2. ^ Emiliani, Bob; Stec, David; Grasso, Lawrence; Stodder, James (2007). Better thinking, better results: case study and analysis of an enterprise-wide lean transformation (2nd ed.). Kensington, Conn: Center for Lean Business Management. ISBN 978-0-9722591-2-5.