Mudanjiang–Jiamusi high-speed railway

From Wikipedia, the free encyclopedia
Mudanjiang–Jiamusi high-speed railway
Overview
Native name牡佳高铁
StatusOperational
Termini
Stations7
Service
Operator(s)China Railway High-speed
History
OpenedDecember 6, 2021[1]
Technical
Line length371.6 km (231 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed250 km/h (155 mph)

The Mudanjiang–Jiamusi high-speed railway, or Mudanjiang–Jiamusi section of Shenyang–Jiamusi high-speed railway,[1] is a high-speed railway line in China. It is 371.6 kilometres (230.9 mi) long and have a maximum speed of 250 kilometres per hour (160 mph).[2] It was opened on December 6, 2021.[1]

History

[edit]

Construction on the railway began in November 2016.[2]

Stations

[edit]

The line will have seven stations:[3]

References

[edit]
  1. ^ a b c "沈佳高铁牡丹江至佳木斯段将于12月6日开通运营" [Shenyang–Jiamusi high-speed railway (Mudanjiang-Jiamusi section) will open on December 6.]. 2021-12-04. Archived from the original on 2021-12-04.
  2. ^ a b "牡佳高铁全面复工 预计6月将进入联调联试阶段" [Mudanjiang-Jiamusi high-speed rail full-scale resumption of work is expected to enter the joint trial phase in June]. 岩土网 (in Chinese). 26 March 2021. Retrieved 26 March 2021.
  3. ^ "工期提前!牡佳高铁有望明年12月竣工通车,途径5市设站7座" [The schedule is ahead of schedule! Mudanjiang-Jiamusi high-speed railway is expected to be completed in December next year, through 5 city with 7 stations]. 搜狐 (in Chinese). 4 December 2020. Retrieved 26 March 2021.