Milltown biomass-to-energy power station
Map
Country
  • United States
Locationnear Milltown, Indiana
Coordinates38°21′32″N 86°17′02″W / 38.3589°N 86.2839°W / 38.3589; -86.2839
StatusInactive (permit applications withdrawn)
Commission datenever constructed
OwnerLiberty Green Renewables
Thermal power station
Primary fuelBiomass
Turbine technologyFluidized-bed boiler/steam generation
Cooling sourceBlue River
Power generation
Units operational0
Nameplate capacity28 MWe

The Milltown Biomass-to-Energy Power Station was proposed as a 28 MWe biomass-to-electrical energy power station to be built near Milltown, Indiana in Crawford County. The project was proposed in December 2008 by Liberty Green Renewables (LGR), based in Georgetown, Indiana.

After significant opposition to its proposal by local community organizations, in 2011, LGR requested permanent revocation of two air permits and one acid rain permit it had been issued by the Indiana Department of Environmental Management. According to LGR representative, J.P. Rexroad, author of the request letter, dated September 26, 2011, "All of the sources permitted under the above-listed permits were never constructed or operated, and there are no longer any plans to do so.[1]

The plant was originally to use woody biomass material from a number of local forest products and industrial sources, including residues from logging, land clearing activities, pallet manufacturing, furniture and cabinet manufacturing, sawmills, tree trimming and storm damage.

Later, LGR amended its permit to include additional sources such as scrap wood from demolition, but was prohibited from using any wood contaminated with lead from paint or other sources, or arsenic and the like from pressure-treating processes.

According to the company's original proposal, the facility would have used fluidized-bed boiler technology to enable incineration of a wide variety of woody biomass materials.[2]

In LGR's first filing with the state, the company proposed discharging more than 170,000 gallons of water per day into the Blue River, but Terry Naulty of LGR told Fox 41 News the citizen response had prompted the company to propose, as an alternative, discharging the water onto its own property where it would grow energy crops and use it for irrigation water."

The area under discussion is karst geology, and it is unsure what impact the proposed discharge of large volumes of waste water would have had. The area underlying the proposed power plant is honeycombed with caves, fractures, and underground streams. Water dumped into "sink holes"—openings into the cave system—would typically migrate quickly though the rock via underground channels and fractures, possibly reaching the level of groundwater, or working its way into streams, wells, and rivers. The proposed site was adjacent to the Blue River, a state Wild and Scenic River area.

In addition to citing air pollution concerns, local residents contended that they depended on the ground water for their drinking water, and the river and caves were habitat for state and federally endangered species such as the Hellbender salamander and the Indiana Cave Bat.