MidAmerica St. Louis Airport station

Coordinates: 38°32′56″N 89°48′47″W / 38.548827°N 89.812921°W / 38.548827; -89.812921
From Wikipedia, the free encyclopedia

MidAmerica St. Louis Airport
General information
LocationMidAmerica St. Louis Airport
Mascoutah, Illinois
Coordinates38°32′56″N 89°48′47″W / 38.548827°N 89.812921°W / 38.548827; -89.812921
Owned byBi-State Development Agency
Operated byMetro Transit
Platforms1 island platform
Tracks2
Construction
Structure typeAt-grade
ParkingPaid parking nearby
Bicycle facilitiesMetroBikeLink Trail
AccessibleYes
History
Opening2025 (2025)
Services
Preceding station MetroLink Following station
Shiloh–Scott Red Line Terminus
Location
Map

MidAmerica St. Louis Airport station is an under construction St. Louis MetroLink station in Mascoutah, Illinois, adjacent to MidAmerica St. Louis Airport, after which the station is named. When opened, this station will be the eastern terminus of the MetroLink system. It is scheduled to open in spring 2025 as part of a 5.2-mile (8.4 km) expansion of the Red Line from Shiloh–Scott station.

History

[edit]

The plan to expand the MetroLink line out to MidAmerica St. Louis Airport received $96 million in funding from the State of Illinois in 2019.[1] The expansion will include a 2.6-mile (4.2 km) double-track section, a 2.6-mile (4.2 km) single-track section and a passenger station at the end of the alignment at MidAmerica Airport.[2] Design work was completed in the summer of 2022 and a request for proposals was released that November. Construction on the expansion is expected to begin by summer 2023 and be operational by spring 2025.[3][4]

Station layout

[edit]
P Platform Westbound      Red Line toward Lambert Airport (Shiloh–Scott)
Island platform, doors will open on the left
Westbound      Red Line toward Lambert Airport (Shiloh–Scott)
Street Entrance/exit, airport access

References

[edit]
  1. ^ Schlinkmann, Mark (June 14, 2019). "Illinois to pay for long-sought MetroLink extension to MidAmerica Airport". St. Louis Post-Dispatch. Retrieved September 20, 2022.
  2. ^ "Trajectory for Transit in 2022 Points to Need for Continued Collaboration". Citizens For Modern Transit. January 19, 2022. Retrieved February 2, 2022.
  3. ^ "When will MetroLink extension to MidAmerica Airport be complete? How much will it cost?". MidAmerica St. Louis Airport. July 14, 2021. Retrieved September 20, 2022.
  4. ^ Menn, Mackenzie (November 21, 2022). "MetroLink Expansion in Illinois is on Track". St. Clair County Transit District. Retrieved January 30, 2023.