Jump to content

Metrorrey Line 4

From Wikipedia, the free encyclopedia
Line 4
Overview
StatusUnder construction
OwnerGovernment of the State of Nuevo León
LocaleMonterrey
Termini
  • Hospital de Ginecología
  • Pablo González Garza
Stations8
Service
TypeMonorail
SystemMetrorrey
Operator(s)Sistema de Transporte Colectivo Metrorrey
History
OpenedBy June 2026[1] (planned)
Technical
Line length7.5 km (4.7 mi)
Track gaugeMonorail
Route map
Santa Lucía
Hospital de Ginecología
Barrio Antiguo
Palacio
Juárez
Cuauhtémoc
Serafin Peña
ISSSTE
Obispado
San Jeronimo
Pablo G. Garza

Metrorrey Line 4 is an under-construction Metrorrey line that will municipalities of Monterrey and San Pedro Garza García. It will have an extension of approximately 7.5 kilometers. It will connect with lines 3, 5 and 6 at the Saint Lucia station (in front of the High Specialty Medical Unit No. 23 of the Mexican Social Security Institute).

On 29 April 2022, the Government of the State of Nuevo León launched an international public tender for the construction of the line. Construction work is expected to begin on 31 August 2022 and end on 31 August 2027. The second phase of the construction of 13.5 kilometres of lines 4 and 6 was expected to be completed on 30 November 2024,[2][3] though as of May 2024, Governor Samuel García expects lines 4 and 6 to be ready by the time the 2026 FIFA World Cup happens in June 2026.[1]

History

[edit]

First hints

[edit]

In April 2014, the president of Mexico, Enrique Peña Nieto, announced, in his speech at the 70th assembly of the Chamber of the Transformation Industry of Nuevo León, said that resources had been given to Nuevo León for the construction of Metrorrey Lines 3 and 4.[4] In addition to the possibility of a new line, extensions to lines 1 and 2 were considered. The first option was to expand the viaduct of Line 1, from the Exhibition station, in Guadalupe, to Juárez and Cadereyta, via the free road to Reynosa. The second option was to continue the work of Line 3, which at that time was under construction, from the Metropolitan Hospital, in San Nicolás, to the municipality of Apodaca, using the corridor of López Mateos Avenue. A third option envisaged building the Mederos unit of the Autonomous University of Nuevo León, starting from a terminal in front of the High Specialty Medical Unit No. 23 of the Mexican Social Security Institute in Felix U. Gómez and with a tour of Eugenio Garza Sada Avenue. Finally, the viaduct to the west of the metropolitan area was analyzed to build, in order to benefit the inhabitants of San Pedro Garza García, Santa Catarina, and García, but the outline of this option was not revealed by the state government.[5]

Current proposal

[edit]

In late 2021, governor of Nuevo León Samuel García announced the construction of Metrorrey Lines 4 and 5, then reported through a video on his social networks the place where the new metro lines will pass. The first plan presented provided that line 4 would go from the center of the municipality of Santa Catarina to the center of Monterrey having an original extension of 13.6 kilometers.[6] In the publication of the tender it was cut to 7.5 kilometers ending in the colony of San Jerónimo on the borders of Monterrey and San Pedro Garza García since the master plan and the plans for the Tren Suburbano de Monterrey was updated it will pass to the center of the municipality of Santa Catarina.[2]

Tendering process

[edit]

On 9 September 2022, the technical openings were completed as part of the process of the international public tender, two consortia were registered to win the award of the construction of Lines 4, 5 and 6. One of the consortia is made up of the companies Mota-Engil Mexico and China Communications Construction Company, which also have the construction of a section of the Tren Maya. The other consortium consists of the companies Ferrovías del Bajío, Hércules Construcciones de Monterrey, Constructora Moyeda, Manufacturas Metálicas Ajax, Tordec, Inversiones Ferroviarias de México, Consega Diseño y Construcciones, and Vivienda y Construcciones.[7]

On 15 September 2022 the economic proposals were submitted by both consortia and, in accordance with the timetable for the tender, on 23 September 2022 the final judgment was awarded to the winning consortium. During the presentation stage of economic proposals for construction, the Secretariat of Urban Mobility and Planning of Nuevo León rejected the proposal of the consortium composed of the Mexican companies Ferrovías del Bajío, Hércules Construcciones de Monterrey, Constructora Moyeda, Manufacturas Metálicas Ajax, Tordec, Inversiones Ferroviarias de México, Consega Diseño y Construcciones, and Vivienda y Construcciones. It was explained that in none of the above-mentioned contracts had the consortium built any light rail, metro, or monorail lines in the last 15 years. Similarly, they were made aware that braking traction systems and automatic driving systems have not been constructed or operated by any of the members of that consortium.[8]

On 23 September 2022, the tender was awarded for the construction of lines 4, 5 and 6 of the Metro to the consortium formed by the Portuguese firm Mota-Engil de México and the Chinese CRRC Hong Kong. At a press conference, it was reported that CRRC will be the supplier of rolling stock, while Mota-Enegil will take care of the construction. The Secretary of Urban Mobility and Planning of Nuevo León Hernán Villarreal explained that the tender has two cost options and that both are profitable for the administration. If the 3 lines are raised, the amount will amount to 25.861 million pesos plus VAT. If line 5 is built at level, the cost would drop to 25.857 million pesos plus VAT. The consortium formed by Mota-Engil and CRRC will sign the contract on 26 September at 10:00, at the offices of the Legal Directorate of the Secretariat of Mobility and Urban Planning, located in the Administrative Tower. Regarding the possibility of building part of the transport system at the street level, during the reading of the failure of the SMPU-LPI-001-2022 tender it was specified that this topic will be defined in November 2024.[9][10]

The construction process began on 30 September 2022 for lines 4 and 6 being monorail type. A popular consultation will be held in November 2024 to determine whether Metrorrey Line 5 will be an elevated monorail or a rapid transit line at ground level.

Construcción

[edit]

On 11 April 2023, work began between the Hospital de Gynecología (Santa Lucía) and Juárez (Pavilion M) stations. On May 4, it was announced that the work of these two stations is expected to be completed in May 2024,[11] and then the work to the Miravalle area will continue.

See also

[edit]

References

[edit]
  1. ^ a b Solheim Rocha, Erik (29 May 2024). "Nuevas líneas del Metro llevan un 30 por ciento de avance, señala Samuel García". Milenio. Retrieved 2 June 2024.
  2. ^ a b Charles, Ángel (29 April 2022). "Ajustan 3 líneas y lanzan licitación". El Norte (in Spanish). Retrieved 1 May 2022.
  3. ^ Chio, Yolanda (29 April 2022). "Publican licitación para Líneas 4, 5 y 6 del Metro". info7 (in Spanish). Retrieved 1 May 2022.
  4. ^ Garza, Eddisa (9 April 2014). "Anuncia Peña Nieto ¡Línea 4 del Metro!". Dominio Medios (in Spanish). Retrieved 1 May 2022.
  5. ^ "¿Cuál será la ruta para la Línea 4 del Metro?". Multimedios (in Spanish). 30 April 2014. Retrieved 1 May 2022.
  6. ^ Gallegos, Fabricio (18 November 2021). "Samuel García anuncia Línea 4 y 5 del Metro". abcnoticias (in Spanish). Retrieved 1 May 2022.
  7. ^ Maldonado Rodríguez, Orlando (9 September 2022). "Van 2 grupos a la final por obras de las Líneas 4, 5 y 6 de Metrorrey". Milenio (in Spanish). Retrieved 16 September 2022.
  8. ^ Maldonado Rodríguez, Orlando (15 September 2022). "Ferrovías del Bajío queda fuera de licitación para Líneas 4, 5 y 6 de Metrorrey". Telediario (in Spanish). Retrieved 16 September 2022.
  9. ^ Perales, Marcela (23 September 2022). "Consorcio chino-portugués gana licitación de líneas 4, 5 y 6 del Metro en Monterrey". ABC Noticias (in Spanish). Retrieved 23 September 2022.
  10. ^ Cerda, Rosario (23 September 2022). "Mota-Engil y CRRC construirán líneas 4, 5 y 6 del Metro de Monterrey". Milenio Noticias (in Spanish). Retrieved 23 September 2022.
  11. ^ "Terminarán en mayo de 2024 el primer tramo de la Línea 6". El Horizonte. 4 May 2023.