List of proposed and under-construction Kolkata metro stations
Appearance
Part of a series of articles on the |
Kolkata Metro |
---|
Commons |
The Kolkata Metro (Bengali: কলকাতা মেট্রো), was the first underground railway to be built in India, with the first operations commencing in October, 1984 and the full stretch that was initially planned being operational by February, 1995.
From Dakshineswar to Kavi Subhash
Name of the station | Location | Distance from South end (in km) | Status | Opening |
---|---|---|---|---|
- | - | - | - | - |
From Howrah Maidan to Teghoria via Dharmatala and Salt Lake
# | Name of the proposed station | Location | Distance from West end (in km) | Status | Opening (expected) | |
---|---|---|---|---|---|---|
English | Bengali | |||||
1 | Teghoria | তেঘরিয়া | Teghoria | Planned | - | |
2 | Raghunathpur | রঘুনাথপুর | Baguiati | |||
3 | Baguiati | বাগুইআটি | Baguiati | |||
4 | Dum Dum Park | দমদম পার্ক | Dum Dum Park | |||
5 | Kestopur | কেষ্টপুর | Kestopur |
As of 2018, extension of East side of Kolkata Metro Line 2 has been proposed up to Santragachi and to be sanctioned by Railway ministry, Government of India.[1]
From Joka to Esplanade via Diamond Harbour Road and Khidderpore Road
# | Name of proposed station | Location | Distance from South end (in km) | Status | Opening (expected) | |
---|---|---|---|---|---|---|
English | Bengali | |||||
1 | Mominpur | মোমিনপুর | Mominpore | 8.755 | Under Construction | 2026[2] |
2 | Khidirpur | খিদিরপুর | Kidderpore | 9.87 | ||
3 | Victoria | ভিক্টোরিয়া | Maidan | 12.025 | ||
4 | Park Street | পার্ক স্ট্রীট | Park St. | 13.29 | ||
5 | Esplanade | এসপ্ল্যানেড | Esplanade | 14.215 | ||
6 | IIM Calcutta | আই আই এম ক্যালকাটা | IIM Calcutta | - | Planned | - |
7 | Diamond Park | ডায়মন্ড পার্ক | Diamond Park | - |
From Noapara to Barasat via Kolkata Airport[3]
# | Name of proposed station | Location | Distance from West end (in km) | Status | Opening (expected) | |
---|---|---|---|---|---|---|
English | Bengali | |||||
1 | Noapara | নোয়াপাড়া | Noapara | 0.000 | Under construction | March, 2025[4] |
2 | Dum Dum Cantonment | দমদম ক্যান্টনমেন্ট | Dum Dum Cantonment | 2.835 | ||
3 | Jessore Road | যশোহর রোড | Kolkata Airport: Gate no.1 | 5.125 | ||
4 | Jai Hind | জয় হিন্দ | Kolkata Airport | 6.249 | ||
5 | Birati | বিরাটি | Birati | 7.810 | 2027-'28[5] | |
6 | Michael Nagar | মাইকেল নগর | Micheal Nagar | 9.000 | ||
7 | New Barrackpur | নিউ ব্যারাকপুর | New Barrackpore | 10.250 | - | |
8 | Madhyamgram | মধ্যমগ্রাম | Madhyamgram | 12.310 | Planned | |
9 | Hridaypur | হৃদয়পুর | Hridaypur | 14.930 | ||
10 | Barasat | বারাসাত | Barasat | 16.876 |
From Baranagar to Barrackpore via Barrackpore Trunk Road[3]
# | Name of proposed station | Location | Distance from South end (in km) | Status | Opening (expected) | |
---|---|---|---|---|---|---|
English | Bengali | |||||
1 | Baranagar | বরাহনগর | Baranagar | 0.00 | Planned | - |
2 | Krishna Kali | কৃষ্ণ কলি | Kamarhati | 1.20 | ||
3 | Acharya Prafulla Chandra | আচার্য প্রফুল্ল চন্দ্র | Agarpara | 2.80 | ||
4 | Gandhi Ashram | গান্ধী আশ্রম | Panihati | 4.20 | ||
5 | Sarat Chandra | শরৎ চন্দ্র | Sodepur | 5.40 | ||
6 | Subhas Nagar | সুভাষ নগর | Sukchar | 6.50 | ||
7 | Rishi Bankim | ঋষি বঙ্কিম | Khardaha | 7.90 | ||
8 | Dr. Rajendra Prasad | ডঃ রাজেন্দ্র প্রসাদ | Titagarh Power Plant | 8.80 | ||
9 | Shah Nawaz Khan | শাহ নওয়াজ খান | Titagarh | 10.10 | ||
10 | Anukul Thakur | অনুকূল ঠাকুর | Talpukur | 11.40 | ||
11 | Mangal Pandey | মঙ্গল পাণ্ডে | Barrackpore | 12.40 |
From New Garia to Kolkata Airport via Salt Lake and New Town.[3]
# | Name of Proposed Station | Location | Distance from South end (in km) | Status | Opening (expected) | |
---|---|---|---|---|---|---|
English | Bengali | |||||
1 | VIP Bazar | ভি আই পি বাজার | VIP Bazar | 6.36 | Under construction | 2025[6][7] |
2 | Ritwik Ghatak | ঋত্বিক ঘটক | Bantala Rd | 7.30 | ||
3 | Barun Sengupta | বরুণ সেনগুপ্ত | Science City | 8.23 | ||
4 | Beleghata | বেলেঘাটা | Metropolitan | 9.50 | ||
5 | Gour Kishore Ghosh | গৌর কিশোর ঘোষ | Sukant Nagar | 11.1 | ||
6 | Nalban | নলবন | Nicco Park | 12.57 | ||
7 | IT Centre | আই টি সেন্টার | Sector-V: CM Block | 14.02 | ||
8 | Nabadiganta | নবদিগন্ত | Technopolis Signal | 15.15 | 2026[2] | |
9 | Nazrul Tirtha | নজরুল তীর্থ | New Town Bus Stand | 16.22 | ||
10 | Swapnabhor | স্বপ্নভোর | Axis Mall | 17.55 | ||
11 | Biswa Bangla Convention Centre | বিশ্ব বাংলা কনভেনশন সেন্টার | Biswa Bangla Convention Centre | 18.69 | ||
12 | Shiksha Tirtha | শিক্ষা তীর্থ | Fintech Hub | 20.07 | ||
13 | Mother's Wax Museum | মাদার্স ওয়াক্স মিউজিয়াম | Eco Park: Gate 2 | 20.91 | ||
14 | Eco Park | ইকো পার্ক | Eco Park: Gate 4 | 22.17 | ||
15 | Mangaldeep | মঙ্গলদীপ | Automobile Hub | 23.37 | ||
16 | City Centre-2 | সিটি সেন্টার ২ | City Centre-II | 24.25 | ||
17 | Chinar Park | চিনার পার্ক | Chinar Park | 26.34 | ||
18 | VIP Road | ভি আই পি রোড | Haldirams Signal | 27.88 | ||
19 | Jai Hind | জয় হিন্দ | Kolkata Airport | 29.87 |
See also
[edit]References
[edit]- ^ "E-W Metro set to expand".
- ^ a b "Kolkata Metro: Orange & Purple Line Work Reviewed, To Be Fully Operational By 2026". News18. 11 July 2024. Retrieved 23 October 2024.
- ^ a b c "New System Map of Kolkata Metro".
- ^ "Airport metro dream may come true in March". The Times of India. 22 October 2024. Retrieved 23 October 2024.
- ^ https://www.facebook.com/share/p/1sJrdDp7mDZrTjB8/
- ^ "Budget boost: Metro eyes full Orange Line ops by March '25". The Times of India. 26 July 2024. Retrieved 23 October 2024.
- ^ "Metro network in Kolkata to span 90 km by next yr, 130 km in 3 yrs". The Times of India. 19 October 2024. Retrieved 23 October 2024.