List of energy storage projects in South Australia
Appearance
As of 2020, South Australia has 3 grid-connected energy storage devices, with a total capacity of 205 MW / 253.5 MWh.
Table
[edit]Project name | Sponsoring company | Coordinates | Capacity (MW) | Storage (MWh) | Technology | Status | Notes |
---|---|---|---|---|---|---|---|
Dalrymple ESCRI Battery | AGL Energy | 34°56′10″S 137°44′38″E / 34.936°S 137.744°E | 30 | 8 | Lithium Ion Battery | Operating | |
Hornsdale Power Reserve | Neoen Australia | 33°03′29″S 138°32′38″E / 33.058°S 138.544°E | 150 | 193.5 | Lithium Ion Battery | Operating | Was 100MW/129MWh, until 50% expansion in July 2020. Expanded to 150MW/193.5MW. [1] |
Lake Bonney Battery Energy Storage System | Infigen Energy | 37°44′20″S 140°23′13″E / 37.739°S 140.387°E | 25 | 52 | Lithium Ion Battery | Operating | [2][3] |
Lincoln Gap Wind Farm Battery Energy Storage System | Fluence | 10 | 10 | Lithium Ion Battery | Commissioning | [4][5] | |
Baroota Pumped Hydro | Rise Renewables | 250 | 2000 | Pumped Hydro | Approved | [6][7][8] | |
Cultana Pumped Hydro | EnergyAustralia / Arup Group | 225 | 1800 | Pumped Hydro | Cancelled | [9][10][11][12][13][7] | |
Goat Hill Pumped Hydro | Altura Group | 230 | 1840 | Pumped Hydro | Cancelled | [14][7] | |
Highbury Pumped Hydro | Tilt Renewables | 300 | 1350 | Pumped Hydro | Cancelled | [15][16][7] | |
Kanmantoo Pumped Hydro | AGL Energy | 250 | 2000 | Pumped Hydro | Cancelled | [17][18][7] | |
Kingfisher Battery Power Plant | Lyon Group | 100 | 400 | Lithium Ion Battery | Proposed | [19] | |
Bungama Solar | EPS Energy | 140 | 560 | Lithium Ion Battery | Approved | [20] | |
Robertstown Solar | EPS Energy | 250 | 1000 | Lithium Ion Battery | Approved | [21] | |
Solar River Project | Alinta Energy | 100 | 300 | Battery | Proposed | [22] | |
Playford Battery | GFG Alliance | 100 | 200 | Lithium Ion Battery | Cancelled | [23][24][25] | |
Middleback Range Pumped Hydro | GFG Alliance | 90 | 390 | Pumped Hydro | Assumed Cancelled | [26][27][7] | |
Torrens Island Battery | AGL Energy | 250 | 250 | Lithium Ion Battery | Commissioning | [28][29][30][31] |
References
[edit]- ^ "Hornsdale Power Reserve | South Australia's Big Battery". hornsdalepowerreserve.com.au. Archived from the original on 18 October 2020. Retrieved 17 October 2020.
- ^ "Lake Bonney Battery Energy Storage System - Infigen Energy". www.infigenenergy.com. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- ^ Parkinson, Giles (8 May 2019). "Tesla big battery at Lake Bonney wind farm faces connection delays". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- ^ "Lincoln Gap Wind Farm Battery Energy Storage System". Enerven. Archived from the original on 9 March 2021. Retrieved 24 March 2021.
- ^ Parkinson, Giles (24 January 2018). "Construction begins on 212MW wind farm and storage project in S.A." RenewEconomy. Archived from the original on 3 March 2021. Retrieved 24 March 2021.
- ^ "Baroota Pumped Hydro Project | Rise Renewables". Archived from the original on 4 July 2019. Retrieved 5 August 2019.
- ^ a b c d e f Parkinson, Giles (12 November 2021). "One pumped hydro project still standing as South Australia heads to 100pct wind and solar". RenewEconomy. Retrieved 14 November 2021.
- ^ "Baroota Pumped Hydro". UPC/AC Renewables. Retrieved 14 November 2021.
- ^ "Cultana Pumped Hydro Energy Storage Project ARENA Knowledge Sharing Report (Public)" (PDF). Archived (PDF) from the original on 13 November 2020. Retrieved 14 November 2020.
- ^ "World's largest saltwater pumped hydro for South Australia". Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- ^ "Australia's Pumped Hydro Prospects "Destroy" Wind And Solar Arguments". Solar Quotes Blog. 25 March 2019. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- ^ "Cultana Pumped Hydro Project". EnergyAustralia. Archived from the original on 18 June 2019. Retrieved 5 August 2019.
- ^ "Cultana Pumped Hydropower Project, Port Augusta, Australia". Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- ^ "Goat Hill Pumped Storage Hydro Project". Altura Group. Archived from the original on 22 July 2019. Retrieved 5 August 2019.
- ^ "Highbury Pumped Hydro Energy Storage". Tilt Renewables. Archived from the original on 22 July 2019. Retrieved 5 August 2019.
- ^ "Adelaidenow.com.au | Subscribe to The Advertiser for exclusive stories". www.adelaidenow.com.au. Archived from the original on 3 September 2021. Retrieved 31 May 2020.
- ^ Parkinson, Giles (16 April 2019). "AGL plans 250MW pumped hydro plant in South Australia as replacement for gas". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- ^ "AGL, Hillgrove Resources scrap 250 MW pumped hydro plans". pv magazine Australia. Archived from the original on 21 May 2020. Retrieved 31 May 2020.
- ^ "Kingfisher Battery Power Plant | Lyon Group". Retrieved 5 August 2019.
- ^ Vorrath, Sophie (19 July 2019). "Fourth huge solar and battery project approved for South Australia". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- ^ Vorrath, Sophie (4 July 2019). "Huge solar and battery project wins development approval in South Australia". RenewEconomy. Archived from the original on 18 August 2019. Retrieved 5 August 2019.
- ^ Vorrath, Sophie (18 July 2019). "Alinta signs up for huge solar and battery project in South Australia". RenewEconomy. Archived from the original on 18 July 2019. Retrieved 5 August 2019.
- ^ Vorrath, Sophie (19 July 2019). "Fourth huge solar and battery project approved for South Australia". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- ^ Parkinson, Giles (28 May 2019). "Gupta seeks regulatory approval for 135MW battery near Port Augusta". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- ^ Parkinson, Giles (8 June 2021). "Gupta's GFG Alliance cancels plans for Cultana solar farm and Playford battery". RenewEconomy. Archived from the original on 8 June 2021. Retrieved 3 September 2021.
- ^ Parkinson, Giles (1 February 2019). "Gupta challenges coalers with $1 billion plus solar and storage plan". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- ^ "Cultana Solar Farm eyes project kick-off". Energy Magazine. 1 June 2020. Archived from the original on 26 September 2020. Retrieved 26 March 2021.
- ^ "AGL unveils plans for grid-scale battery in South Australia". AGL.com.au. 16 November 2020. Archived from the original on 3 April 2021. Retrieved 24 March 2021.
- ^ "AGL prepares for construction of grid-scale battery at Torrens Island". AGL.com.au. 24 March 2021. Archived from the original on 2 April 2021. Retrieved 24 March 2021.
- ^ Parkinson, Giles (23 March 2021). "AGL gives green light to 250MW Torrens big battery in South Australia". RenewEconomy. Archived from the original on 24 March 2021. Retrieved 24 March 2021.
- ^ https://reneweconomy.com.au/tesla-big-battery-loses-biggest-title-as-torrens-island-finally-ready-to-charge-up/