Jump to content

List of Sonoma–Marin Area Rail Transit stations

From Wikipedia, the free encyclopedia

Sonoma County Airport station, featuring a gauntlet track

Sonoma–Marin Area Rail Transit, or SMART, is a commuter rail service in California's Sonoma and Marin counties. As of 2019 the line serves 12 stations: ten opened in the initial operating segment (IOS) and two were added when the line was extended to Larkspur. Four more stations are planned to open after further construction.[1]

The main line was built primarily by the Northwestern Pacific Railroad and received regular service until 1958 when passenger trains were discontinued south of Willits. After the decline in railway traffic in the post-WWII years, the line was eventually closed to all rail activity. The right-of-way was acquired by a special-purpose district and reopened to freight movements in 2011 and passenger service on August 25, 2017.[2]

Station platforms are 300 feet (91 m) in length (the sole exception is San Rafael's 285-foot (87 m) northbound platform) and are high-level to provide accessible boarding. Gauntlet tracks are installed at stations north of Ignacio to allow freight trains to pass with proper clearance.[3] Novato Downtown, San Rafael, and Santa Rosa stations are located adjacent to former NWP station buildings (as will be Healdsburg and Windsor), but the buildings are used for other purposes.

Stations

[edit]
County Municipality Station Connections Service began Parking spaces Image
Sonoma Mark West Sonoma County Airport Bus interchange Sonoma County Transit
Bus interchange Shuttle to Airport interchange Sonoma County Airport[4]
August 25, 2017 (2017-08-25)[b] 50 Sonoma County Airport station in 2016, featuring a gauntlet track
Santa Rosa Santa Rosa North Bus interchange Santa Rosa CityBus
Bus interchange Sonoma County Transit[4]
0 A northbound train at Santa Rosa North station, 2018
Santa Rosa Downtown A northbound train at Santa Rosa Downtown station, 2018
Rohnert Park Rohnert Park Bus interchange Sonoma County Transit[4] August 25, 2017 (2017-08-25)[a] n/a The platform at Rohnert Park station, 2018
Cotati Cotati n/a The platforms at Cotati station, 2018
Petaluma Petaluma Downtown Bus interchange Sonoma County Transit[4]
Bus interchange Petaluma Transit
50 A southbound train at Petaluma Downtown station, 2019
Marin Novato Novato San Marin Bus interchange Golden Gate Transit
Bus interchange Marin Transit
45 A northbound train at Novato San Marin station, 2018
Novato Downtown December 14, 2019 (2019-12-14) 0 A southbound train at Novato Downtown station, 2019
Novato Hamilton August 25, 2017 (2017-08-25)[a] 115 A view of Novato Hamilton station from Main Gate Road, 2018
San Rafael Marin Civic Center Bus interchange Marin Transit [d] A northbound train at Marin Civic Center station, 2018
San Rafael Bus interchange Golden Gate Transit
Bus interchange Marin Airporter
Bus interchange Marin Transit
Bus interchange Sonoma County Transit
Greyhound Lines Greyhound Bus Lines
August 25, 2017 (2017-08-25)[c] 0 The platforms at San Rafael Transit Center, 2018
Larkspur Larkspur Bus interchange Marin Transit
ferry/water interchange Larkspur Ferry Terminal
December 14, 2019 (2019-12-14) n/a The first revenue train at Larkspur station in December 2019
Line termini

Notes
a Station opened to limited preview service on June 29, 2017.[5]
b Station opened to limited preview service on July 1, 2017.[5]
c Station opened to limited preview service on July 8, 2017.[6]
d Free street parking

Future stations

[edit]
Station Projected opening Municipality County Status / Notes
Cloverdale 2027[7] Cloverdale Sonoma Eventual northern terminus of system
Healdsburg 2027 Healdsburg
Windsor 2025 Windsor
Petaluma North 2025 Petaluma Planned infill station

Suggestions have been put forward to eventually expand to Napa or Solano counties with connections at Suisun–Fairfield station,[7] or north along the Northwestern Pacific right of way to Ukiah or Willits[8][9] in Mendocino.

References

[edit]
  1. ^ Prado, Mark (April 8, 2016). "SMART OKs rail stop in downtown Novato". Marin Independent Journal. Digital First Media.
  2. ^ "Freight Trains and Passenger Trains," (PDF). Sonoma–Marin Area Rail Transit. July 2008. Archived from the original (pdf) on June 13, 2010.
  3. ^ SMA Rail Consulting (April 2016). "California Passenger Rail Network Schematics" (PDF). California Department of Transportation.
  4. ^ a b c d Moore, Derek (July 14, 2017). "Sonoma County adds bus routes designed to serve SMART train users". The Press Democrat. Retrieved July 19, 2017.
  5. ^ a b "SMART Preview: Take a Ride with Us". Sonoma–Marin Area Rail Transit. Archived from the original on June 30, 2017. Retrieved June 29, 2017.
  6. ^ "SMART announces dates and schedule for free public Preview Rides in July" (PDF) (Press release). Sonoma–Marin Area Rail Transit. July 3, 2017.
  7. ^ a b "2018 California State Rail Plan (Draft)" (PDF). CalTrans. Retrieved 7 November 2017.
  8. ^ Quackenbush, Gary (30 October 2018). "SMART train system details roll-out to Windsor, Healdsburg, Cloverdale, Sonoma". North Bay Business Journal. Retrieved 2 November 2018.
  9. ^ Fixler, Kevin. "North Coast trail bill re-imagines SMART rail operations extending into Mendocino County". www.pressdemocrat.com. The Press Democrat. Retrieved 21 September 2018.
[edit]