Karuma–Juba High Voltage Power Line
Karuma–Juba High Voltage Power Line Power Line | |
---|---|
Location | |
Country | Uganda & South Sudan |
Coordinates | 02°32′24″N 31°52′38″E / 2.54000°N 31.87722°E |
General direction | South to North |
From | Karuma, Uganda |
Passes through | Olwiyo, Elegu, Nimule |
To | Juba, South Sudan |
Ownership information | |
Owner | Government of Uganda & Government of South Sudan |
Partners | East African Community & Japan International Cooperation Agency |
Operator | Uganda Electricity Transmission Company Limited & South Sudan Electricity Corporation |
Construction information | |
Construction started | TBD |
Expected | TBD |
Technical information | |
Type of current | AC |
Total length | 380 km (240 mi) |
AC voltage | 400kV |
No. of circuits | 2 |
The Karuma–Juba High Voltage Power Line is a planned high voltage electricity power line, connecting the high voltage substation at Karuma, in Kiryandongo District, in the Western Region of Uganda, to another high voltage substation at Juba, in Jubek State, in South Sudan.[1]
Location
[edit]The 400kV power line, begins at the 400kV substation at Karuma Hydroelectric Power Station. The line travels in a north-westerly direction to Olwiyo, in Nwoya District, in the Northern Region of Uganda. This distance is approximately 56 kilometres (35 mi).[2]
At Olwiyo, the line takes a general northerly direction to Elegu at the international border with South Sudan, a distance of about 140 kilometres (87 mi).[3] The distance traveled by this power line in Uganda is therefore approximately 196 kilometres (122 mi).
After crossing the international border into South Sudan, the line travels through Nimule, in Imatong State to Juba, the capital city of South Sudan, a distance of approximately 195 kilometres (121 mi)[4]
Overview
[edit]This power line is planned to transmit electricity from the 600 megawatts Karuma Hydroelectric Power Station in Uganda, to Juba in South Sudan. It is part of the regional power-sharing protocols of the Nile Equatorial Lakes Subsidiary Action Program and of the East African Community. Uganda plans to sell electricity to neighboring countries, including South Sudan after Karuma Hydroelectric Power Station and Isimba Hydroelectric Power Station become operational. The government of South Sudan has plans to extend the high-voltage power line to Juba.[5]
Construction
[edit]The two governments are in discussions on how to fund the construction of the power line, using loans from the Japan International Cooperation Agency, with each country being responsible for the portion of the line in her territory.[6][7][8] The feasibility and environmental impact studies for the 400kV power line were carried out between March 2023 and February 2024 by CESI S.p.A. and ELC Electroconsult S.p.A. both of Italy and Colenco Consulting Limited of Nigeria.[9]
Developments
[edit]In June 2023, South Sudan government officials signed a power purchase agreement (PPA) with officials from the Ugandan Ministry of Energy and Mineral Development.[10] Under the agreement, Uganda will increase the voltage of the section of this transmission line that is in Uganda, from 132kV to 400kV. In addition, Uganda will supply power to several towns in South Sudan bordering Uganda, including Nimule, Elegu, Oraba, Kaya and others. South Sudan will be responsible for extending the transmission line to Juba.[9][11]
In May 2024, high ranking executives from Sinohydro met with the president of Uganda and offered to construct the 140 kilometres (87 mi) Olwiyo-Nimule section of this power line for approximately US$180 million. Sinohydro also offered to finance the project if necessary.[12]
The construction funding of this power line is summarized in the table below. The total cost is estimated at US$302 million (€277.6 million), sourced as outlined here.[13][14][15]
Rank | Lender | Funding in US$ mln | Percentage | Beneficiary | Notes |
---|---|---|---|---|---|
1 | European Union | 100.0 |
33.1 |
South Sudan | Grant[13][15] |
2 | AfDB | 54.0 |
17.9 |
South Sudan | Grant[13][15] |
4 | AfDB | 148.0 |
49.0 |
Uganda | Loan[13][15] |
Total | 302.0 |
100.00 |
- Note: Totals maybe off due to rounding.
See also
[edit]- Bujagali–Tororo–Lessos High Voltage Power Line
- Nkenda–Mpondwe–Beni High Voltage Power Line
- Masaka–Mutukula–Mwanza High Voltage Power Line
References
[edit]- ^ Baker Batte Lule (9 October 2019). "Uganda to supply electricity to South Sudan". The Observer (Uganda). Kampala. Retrieved 22 February 2020.
- ^ "Distance Between Karuma Dam, Uganda and Olwiyo, Nwoya District, Northern Region, Uganda" (Map). Google Maps. Retrieved 5 September 2023.
- ^ "Distance Between Olwiyo, Nwoya District, Northern Region, Uganda and Elegu, Uganda" (Map). Google Maps. Retrieved 5 September 2023.
- ^ "Distance Between Nimule, Imatong State, South Sudan and Juba, Jubek State, South Sudan" (Map). Google Maps. Retrieved 5 September 2023.
- ^ Nelson Wesonga and Stephen Otage (4 October 2017). "Uganda to export electricity to South Sudan, DR Congo". Daily Monitor. Kampala, Uganda. Retrieved 26 February 2019.
- ^ UETCL (2018). "Progress Report of Planned/Future Projects For Uganda Electricity Transmission Company Limited: Regional Power Trade Project : Karuma–Nimule–Juba (South Sudan) 400kV Line (190km) Uganda's Part". Kampala: Uganda Electricity Transmission Company Limited (UETCL). Retrieved 26 February 2019.
- ^ Frederic Musisi (10 August 2018). "Connecting power across borders". Kampala: The Niles Organization. Retrieved 26 February 2019.
- ^ Christine Kasemiire (25 February 2019). "EA must upgrade to ease power trade, says Energy minister". Daily Monitor. Kampala, Uganda. Retrieved 25 February 2019.
- ^ a b Eric Kyama (28 June 2023). "Uganda to build 308km powerline to South Sudan". Pulse Uganda. Kampala, Uganda. Retrieved 25 April 2024.
- ^ Nicholas Nhede (30 June 2023). "Uganda, South Sudan Sign Power Trade Deal". Energy Capital & Power. Cape Town, South Africa. Retrieved 4 July 2023.
- ^ John Odyek (27 June 2023). "Uganda Signs Electricity Sharing Agreement With Sudan". New Vision. Kampala, Uganda. Retrieved 4 July 2023.
- ^ "Uganda in talks with China's Sinohydro over power line to South Sudan" (The EastAfrican Quoting Reuters). The EastAfrican. Nairobi, Kenya. 14 May 2024. Retrieved 15 May 2024.
- ^ a b c d Moses Darlington (15 July 2024). "South Sudan-Uganda Electricity Export Deal To Receive $300 Million Grant". Eye Radio. Juba, South Sudan. Retrieved 16 July 2024.
- ^ Chaney Ninrew (14 May 2024). "Uganda In Talks With Chinese Firm To Build Hydropower Lines To South Sudan". Eye Radio. Juba, South Sudan. Retrieved 16 July 2024.
- ^ a b c d Radio Tamazuj (19 July 2024). "AfDB, EU to finance Uganda-South Sudan power interconnection project". Radio Tamazuj. Juba, South Sudan. Retrieved 21 July 2024.
External links
[edit]- High-voltage transmission lines in Uganda
- Energy infrastructure in Africa
- Energy in Uganda
- Energy in South Sudan
- High-voltage transmission lines in South Sudan
- Proposed electric power transmission systems
- Proposed electric power infrastructure in Uganda
- Proposed electric power infrastructure in South Sudan