JS Shōryū
Appearance
JS Shōryū
| |
History | |
---|---|
Japan | |
Name |
|
Namesake | Dragon overlooking the ground (翔龍) |
Ordered | 2014 |
Builder | Kawasaki Heavy Industries |
Cost | ¥64.3 billion |
Laid down | 28 January 2015 |
Launched | 6 November 2017 |
Commissioned | 18 March 2019 |
Homeport | Kure |
Identification | SS-510 |
Status | Active |
General characteristics | |
Class and type | Sōryū-class attack submarine |
Displacement |
|
Length | 84.0 m (275 ft 7 in) |
Beam | 9.1 m (29 ft 10 in) |
Draught | 8.5 m (27 ft 11 in) |
Propulsion |
|
Speed | |
Range | AIP endurance (est.): 6,100 nautical miles (11,300 km; 7,000 mi) at 6.5 knots (12.0 km/h; 7.5 mph)[1] |
Complement | 65 (9 officers, 56 enlisted) |
Sensors and processing systems |
|
Electronic warfare & decoys |
|
Armament |
|
JS Shōryū (SS-510) is the tenth boat of Sōryū-class submarines. She was commissioned on 18 March 2019.[2]
Construction and career
[edit]Shōryū was laid down at Kawasaki Heavy Industries Kobe Shipyard on January 28, 2015, as the 2014 plan 2900-ton submarine No. 8125 based on the medium-term defense capability development plan. At the launching ceremony, it was named Shōryū and launched on 6 November 2017. She's commissioned on 18 March 2019 and deployed to Kure.
On October 9, 2020, anti-submarine warfare training was conducted with the escort vessels JS Kaga and JS Ikazuchi which were participating in the Reiwa 2nd Indo-Pacific dispatch training in the South China Sea.[4]
Gallery
[edit]Citations
[edit]- ^ a b Pike, John. "SS-501 Soryu / 16SS / SS 2,900 ton Class". www.globalsecurity.org. Archived from the original on 5 March 2016. Retrieved 11 July 2012.
- ^ "Soryu class submarine SS 501 japan maritime self defense force jmsdf". www.seaforces.org. Retrieved 30 October 2020.
- ^ 日本テレビ. "潜航中に充電!最新潜水艦「ずいりゅう」|日テレNEWS24". 日テレNEWS24 (in Japanese). Retrieved 30 October 2020.
- ^ https://www.mod.go.jp/msdf/release/202010/20201009.pdf [bare URL PDF]
External links
[edit]Media related to JS Shōryū (SS-510) at Wikimedia Commons