Jump to content

Ivy Creek Greenway

From Wikipedia, the free encyclopedia

Ivy Creek Greenway
Ivy Creek Greenway near George Pierce Park
Length3.4 miles (5.5 km)
LocationBuford, Georgia, USA
Suwanee, Georgia, USA
Trailheads
UseCycling and pedestrians
SeasonYear round
SurfaceConcrete
WebsiteIvy Creek Greenway

The Ivy Creek Greenway is a 3.4-mile (5.5 km) multi-use trail under construction in the cities of Buford, Georgia and Suwanee, Georgia, in the United States.

In 2014, a 1.5-mile section of the trail was added and includes two boardwalks, an overlook and a 270-foot cable bridge spanning Ivy Creek.[1][2]

On February 27, 2018, the greenway was designated as one of the signature trails of Gwinnett County.[3]

See also

[edit]

References

[edit]
  1. ^ Reed, Kristi. "Newest section of Ivy Creek Greenway opens". Gwinnett Daily Post.
  2. ^ Woodson, Joy. "Ivy Creek Greenway Extension Approved Near Mall of Georgia". Patch.
  3. ^ "Gwinnett trails master plan unveiled for review".
[edit]