Ivy Creek Greenway
Appearance
Ivy Creek Greenway | |
---|---|
Length | 3.4 miles (5.5 km) |
Location | Buford, Georgia, USA Suwanee, Georgia, USA |
Trailheads |
|
Use | Cycling and pedestrians |
Season | Year round |
Surface | Concrete |
Website | Ivy Creek Greenway |
The Ivy Creek Greenway is a 3.4-mile (5.5 km) multi-use trail under construction in the cities of Buford, Georgia and Suwanee, Georgia, in the United States.
In 2014, a 1.5-mile section of the trail was added and includes two boardwalks, an overlook and a 270-foot cable bridge spanning Ivy Creek.[1][2]
On February 27, 2018, the greenway was designated as one of the signature trails of Gwinnett County.[3]
See also
[edit]References
[edit]- ^ Reed, Kristi. "Newest section of Ivy Creek Greenway opens". Gwinnett Daily Post.
- ^ Woodson, Joy. "Ivy Creek Greenway Extension Approved Near Mall of Georgia". Patch.
- ^ "Gwinnett trails master plan unveiled for review".