Heitersberg railway line

From Wikipedia, the free encyclopedia
(Redirected from Heitersberg Tunnel)
Heitersberg railway line
Overview
Native nameHeitersbergstrecke
Line number650, 650.1
LocaleSwitzerland
Termini
Technical
Line length25.4 km (15.8 mi)
Number of tracks2-4
Track gauge1,435 mm (4 ft 8+12 in)
Electrification15 kV/16.7 Hz AC overhead catenary
Route map

km
16.1
Killwangen-Spreitenbach
393 m
to Basel
Heitersberg flying junction
(right track only)
312 m
Heitersberg Tunnel
(4929 m)
22.4
Mellingen Heitersberg
397 m
Fislisbach bridge
168 m
22.8
Gruemet
OV Strasse 5
(66 m)
25.9
Mägenwil
416 m
27.7
27.7
Othmarsingen
419 m
Gexi junction structure
Erlismoos bridge (125 m)
to/from Rotkreuz
31.9
Lenzburg
406 m
32.4
35.6
35.6
Rupperswil
374 m
Rohr-Buchs (closed 1995)
41.5
Aarau
383 m
Source: Swiss railway atlas[1]

The Heitersberg railway line (Heitersbergstrecke) is a Swiss railway line between the stations of Killwangen-Spreitenbach and Aarau on the east-west main line between Zürich and Bern. The main structure of the line is the 4,929-metre-long (3.063 mi) Heitersberg Tunnel, which has its west portal near Mellingen and its east portal near Killwangen.

The line was built in the 1970s as part of the planned New Main Transversal (Neue Haupttransversale, NHT) project. It was opened on 1 June 1975[2] and handed over for scheduled operations on 22 May 1975.

Route

[edit]

The Heitersberg route branches off from the Zürich–Baden–Aarau–Olten–Bern main line after Killwangen and runs through an almost five kilometre-long tunnel to Heitersberg (west portal at 47°25′43″N 8°16′47″E / 47.428702°N 8.27961°E / 47.428702; 8.27961, east portal at 47°26′15″N 8°20′34″E / 47.437464°N 8.342829°E / 47.437464; 8.342829), connecting in Mellingen with the line from Wettingen built by the Swiss National Railway (Schweizerische Nationalbahn) and in Othmarsingen with the Brugg–Hendschiken railway line from Brugg AG to Rotkreuz. Outside of Othmarsingen, there is a three-level crossing with a cantonal road and branches running towards Hendschiken and Lenzburg. West of Lenzburg a new line runs to Rupperswil and then it turns into a recently rebuilt four-track section to Aarau.

Thanks to the new direct line, including the tunnel, which allows speeds of 140 km/h, the running time between Zürich and Bern has been reduced by 20 minutes, partly as a result of the building of other structures such as the Grauholz Tunnel near Bern.

Ballastless track was tested in the Heitersberg tunnel from 1975 to 2014.[3]

Development projects

[edit]

The development of the Heitersberg route is part of the Zukünftige Entwicklung der Bahninfrastruktur (future development of rail infrastructure) program [de]. The construction of the Chestenberg Tunnel between Rupperswil and Gruemet was proposed, but a direct 30 km-long tunnel between Aarau and Zürich is now favoured. The Eppenberg Tunnel has been under construction since 2015 as a continuation of the Heitersberg line towards Olten.

In December 2023 a new connecting track was completed between Mägenwil and the Brugg–Hendschiken line, enabling direct access to Birr. This line will be used by freight traffic and enable more frequent service on the S11 between Mägenwil and Aarau.[4]

References

[edit]
  1. ^ Eisenbahnatlas Schweiz [Swiss railway atlas]. Schweers + Wall. 2012. pp. 10–11. ISBN 978-3-89494-130-7.
  2. ^ Wägli, Hans G. (1998). Generalsekretariat SBB (ed.). Schienennetz Schweiz (in German). Zürich: AS-Verlag. ISBN 978-3-905111-21-7.
  3. ^ "Gotthard Base Tunnel completes LVT installation". Railway Gazette International (in German). 171 (1): 40–43. 2015. ISSN 0373-5346.
  4. ^ "Leistungssteigerung Rupperswil–Mägenwil". company.sbb.ch (in German). Retrieved 2023-12-17.