Jump to content

Haldia Multi-Modal Terminal

From Wikipedia, the free encyclopedia
(Redirected from Haldia Multi-Model Terminal)

Haldia Multi-Modal Terminal
Areal view of Haldia Terminal
Map
Click on the map for a fullscreen view
Location
Country India
LocationHaldia, West Bengal
Coordinates22°03′30″N 88°8′40″E / 22.05833°N 88.14444°E / 22.05833; 88.14444
Details
Operated byInland Waterways Authority of India
Owned byInland Waterways Authority of India
Type of harbourRiver Port
Draft2.5 metres (8 ft 2 in)

The Haldia Multi-Modal Terminal is a inland-terminal in Port City Haldia in East Midnapore district of West Bengal and a small barrier set for small ships.[1][2] The terminal is built near the Haldia Port. The terminal built as a inland-river port with 61 acres of land. The terminal is built by Inland Waterways Authority of India by help of West Bengal and the Calcutta Port Trust.

Cargo is handled through flyash berths and multi-purpose berths located within the terminal's jetty. It have a maximum depth of 3.2 metres (10 ft) and able big barge. According to the Inland Waterways Authority of India, the draft of the port is around 2.5 metres (8.2 ft) with tidal support, which accommodate 3,000 DWT (deadweight tonnage) vessels at the terminal's jetty.[3][4]

Background

[edit]

Due to the shortage of pontoon transport through the waterway, the government of India has decided to transport the commodity to the waterways as compared to the road and railways. For this, the government announced that the goods will be transported from Haldia to Allahabad by sea. For this, the government began to build uplines for small ships or barges in the Hooghly and Ganges rivers. It is said from the government that the terminals will be constructed in Haldia Sahebganj and Varanasi for shipping the goods through the waterway. To this end, construction of multi-modal terminals in Haldia began.

Terminal details

[edit]

harbour

[edit]
In May 2024, dredging is underway by cutter suction dredger Sweta to achieve the prescribed depth in front of the Haldia multi-model terminal jetty.

The harbour of the terminal has a natural harbor, which is protected by balari sandbar. The water depth of the harbour basin is 3.2 metres (10 ft), which accommodate large barges. The approach channel forms a turning circle with 190 metres (620 ft) diameter in the harbour with a depth of 2.5 metres (8.2 ft), which is used to change the direction of the vessel as required before berthing the vessel at the jetty.[5]

Approach channel

[edit]
Depth of water in the channel[5][6]
Depth Measure (meters)
Condition Value
Natural depth Range 1.2–5 metres (3.9–16.4 ft)
Dredged 3.2 metres (10 ft)
Tidal depth Maximum 4–8.9 metres (13–29 ft)

The approach channel connects the 5 metres (16 ft) deep water body to the harbour, Which is constructed by dredging the riverbed from 0.8–1.5 metres (2.6–4.9 ft) to 5 metres (16 ft) deep.[4][6] An 7 kilometers long approach channel at river will be used for the movement of barges to the terminal's jetty.[7] The approach channel has a depth of 3.2 metres (10 ft) and a minimum width of 45 meters, allowing vessels with a draft of 2.5 metres (8.2 ft) to arrive and depart the harbor without tidal assistance.[7] However, the highest and lowest tides observed in the harbor area are 0.8 metres (2.6 ft) and 7.26 metres (23.8 ft) meters respectively, which can significantly increase the depth of the approach channel.[8] At high tide the channel more than 8.5 metres (28 ft) deep with tidal support; vessels with a draft of 2.5 metres (8.2 ft) or more are able to navigate during this period.[5]

Transport of product

[edit]

The proposed Haldia multipurpose terminal in West Bengal will become a major hub for the transportation of goods in West Bengal and north-east India. The terminal has the promise and potential of 5.92 MMPPA [9] freight traffic by 2018.The main products that will be transported through this terminal include fly ash, banaspati oil, cement etc.[10]

See also

[edit]

References

[edit]
  1. ^ "Haldia Multi Modal Terminal to come up by end of 2019, said IWAI Chairman".
  2. ^ "Cabinet approves Jal Marg Vikas Project for enhanced navigation on the Haldia-Varanasi stretch of National Waterway-1".
  3. ^ Dhar 2017, p. 31.
  4. ^ a b Dhar 2017, p. 33.
  5. ^ a b c Dhar 2017, pp. 60–61.
  6. ^ a b Dhar 2017, Layout of Manoeuvring area.
  7. ^ a b Dhar 2017, p. 34.
  8. ^ Dhar 2017, p. 60.
  9. ^ "Cargo Commitments for Multimodal Terminal at Haldia".
  10. ^ "হলদিয়ায় নতুন পরিবহণ টার্মিনাল গড়ে তোলার উদ্যোগ : অর্থনৈতিক কর্মপ্রচেষ্টা বৃদ্ধির পাশাপাশি কর্মসংস্থানের সুযোগ-সুবিধা প্রসারের বিশেষ সম্ভাবনা". Archived from the original on 23 August 2017. Retrieved 23 August 2017.

Bibliography

[edit]
[edit]