Fosroc
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
Formerly | Fosroc Holdings U.K. Limited[1] Fosroc Expandite Limited |
---|---|
Company type | Subsidiary |
Industry | Construction chemicals |
Founded | 1972 |
Headquarters | Dubai, UAE |
Number of locations | 25[2] |
Products | Concrete Repair, Structural Strengthening, Joint Sealants, Adhesives, Waterproofing, Protective Coatings, Concrete Admixtures, Industrial Flooring, Grouts and Anchors |
Brands | Renderoc, Nitomortar, Nitowrap, Nitoplate, Nitorod, Nitoseal, Thioflex, Colpor, Nitotile, Nitobond, Supercast, Proofex, Torchseal, Nitocote, Dekguard, Conplast, Structuro, Auramix, Nitoflor, Trafficguard, Conbextra and Lokfix |
Number of employees | Approx. 3,000 (2023) |
Parent | JMH Group |
Website | www |
Fosroc is a British manufacturer of specialised construction chemicals that cater to a range of sectors including commercial, industrial, residential, marine and infrastructure.[3]
Fosroc has offices and manufacturing locations across Europe, the Middle East and Asia Pacific. They are further represented in other regions around the world through a distributor and licensee network. Fosroc employs around 3,000 employees worldwide.[3]
Notable projects
[edit]Rehabilitation of Asseyedah Fatimah Mosque
[edit]Location: Jeddah, Saudi Arabia
The mosque was Constructed 20 years ago, the reinforced concrete structure had severely deteriorated as a result of reinforcing steel corrosion in a highly aggressive environment. Fosroc Corrosion Solutions (FCS) technology was endorsed by the client as the right solution for the corrosion problem. This was designed to prevent future corrosion potentials and in turn, eliminate the need for future maintenance.[4]
Burj Al Arab
[edit]Al Gurg Fosroc was required to work hand in hand with the contractors and other project consultants to identify the best product combinations that would provide optimal performance in difficult circumstances. The Burj Al Arab is the world's tallest hotel, constructed on a man-made island, surrounded by a seawater environment. Amongst a myriad of construction challenges, careful consideration needed to be given in the selection of concrete admixtures and products to provide waterproofing and pile heads.[5][6]
Hyundai Mipo Shipyard
[edit]Location: Hyundai Mipo Dockyard, Ulsan, South Korea
Constructed in 1975, the Hyundai Mipo shipyard is among the world’s largest and most sophisticated shipyard facilities with a total area of 660,000 square metres. Fosroc Korea demonstrated the recommended solutions for each type of repair at the site. The various repair types included: building façade, rapid setting road repairs and extended-life repairs using anti-corrosion solutions.[7]
St Helens Hospital Redevelopment
[edit]Location: Lancashire, England
The £338m project involved the construction of a new Diagnostic Treatment Centre extending the hospital site over challenging ground conditions. Fosroc worked closely with Project Manager, Taylor Woodrow Construction, Consultants Arup and Architects Capita to develop appropriate solutions from an early stage. Fosroc’s products provided waterproofing and gas protection. Design Manager, Clive Philips of Taylor Woodrow Construction said: "Fosroc UK’s design services and support have been really helpful."[8]
History
[edit]This section needs expansion. You can help by adding to it. (April 2021) |
References
[edit]- ^ "Overview (free company information)". Companies House.
- ^ "Who We Are". Fosroc International Limited.
- ^ a b "Fosroc Ltd". The Construction Index. Retrieved 5 August 2014.
- ^ "Asseyedah Mosque". Fosroc. Archived from the original on 12 July 2014. Retrieved 5 August 2014.
- ^ "Fosroc is a trusted business partner". Gulf Construction Online. Retrieved 5 August 2014.
- ^ "Burj Al Arab". Fosroc. Archived from the original on 12 July 2014. Retrieved 5 August 2014.
- ^ "Hyundai Shipyard". Fosroc. Archived from the original on 12 July 2014. Retrieved 5 August 2014.
- ^ "St Helens Hospital". Fosroc. Retrieved 5 August 2014.