English: Barking Barrier This is the downstream side of the barrier, which was built over a period of four years, being completed in 1983. It is about 60 metres high, and was needed to be this size to allow shipping to reach the Town Quay in Barking further upstream. The barrier crosses the Barking Creek reach of the River Roding, at its confluence with the River Thames.
This image was taken from the Geograph project collection. See this photograph's page on the Geograph website for the photographer's contact details. The copyright on this image is owned by Nigel Cox and is licensed for reuse under the Creative Commons Attribution-ShareAlike 2.0 license.
to share – to copy, distribute and transmit the work
to remix – to adapt the work
Under the following conditions:
attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made. You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
share alike – If you remix, transform, or build upon the material, you must distribute your contributions under the same or compatible license as the original.
== {{int:filedesc}} == {{Information |description={{en|1=Barking Barrier This is the downstream side of the barrier, which was built over a period of four years, being completed in 1983. It is about 60 metres high, and was needed to be this size to allow